2460
|
Tuesday, June 20, 2023, 12:37 |
Adam Newsome | Assembly/Bench Test | Development | | | Modifications to wire ropes for pails within existing F-308s | Based on a request from CNL (attached),
modifications were made to the wire ropes
protruding through the tops of F-308s to |
6x |
2462
|
Wednesday, June 21, 2023, 14:39 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle, |
|
2468
|
Friday, July 28, 2023, 10:09 |
Adam Newsome | Spent Target Vault | Maintenance | | | Main Storage Vault: Bearing Lubrication | Bearings for the main storage vault door
were lubricated on 2023-07-28. It is unknown
when this was last done. It is suggested |
|
2469
|
Friday, July 28, 2023, 10:21 |
Adam Newsome | Spent Target Vault | Maintenance | | | Mini Storage Vault: Bearing Lubrication | The bearings on the mini storage vault
were lubricated. It is suspected that this
has never been done. It is suggested that |
|
2470
|
Tuesday, August 01, 2023, 09:06 |
Adam Newsome | Crane | Development | | | Measuring Tape and Camera Removed from Target Hall Crane | In an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and |
|
2487
|
Friday, September 01, 2023, 10:36 |
Adam Newsome | Spent Target Vault | Standard Operation | | UCx#42 | Spent Target Move | UCx #42 moved from North Hot Cell to Storage
Vault in Pail #282. Placed in slot 6B. Tray
6 is now full. Pail measured at 34.9 mSv/h |
|
2489
|
Thursday, September 14, 2023, 11:16 |
Adam Newsome | Spent Target Vault | Development | | Ta #58 | Investigation of Pail 211 (Ta #58) | Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the |
|
2501
|
Friday, November 17, 2023, 11:12 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Four pails moved from main storage to mini storage | The following four pails were moved from
the main storage vault to the mini storage
vault, to stage for shipping in Jan. 2024: |
|
2502
|
Friday, November 17, 2023, 11:28 |
Adam Newsome | Spent Target Vault | Maintenance | | | Storage vault: issue observed with door opening | During operation today, it was observed
that the main vault door had issues opening..
typically when the door was around 80-90% |
|
2504
|
Wednesday, November 22, 2023, 12:24 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#65 | Spent Target Move | The spent Ta#65 target was removed from
the south hot cell and placed in the spent
target vault. It was placed in pail #284 |
|
2505
|
Thursday, November 23, 2023, 11:15 |
Adam Newsome | Crane | Repair | | | Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker] | It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow, |
|
2507
|
Tuesday, November 28, 2023, 12:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - Silo to SHC | TM3 was moved from the Silo to South Hot
Cell. |
|
2509
|
Wednesday, December 13, 2023, 11:42 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - TCS TO SHC | TM3 has been moved from the target conditioning
station to the south hot cell. |
|
2510
|
Friday, December 15, 2023, 11:07 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 Move - SHC to TCS | TM3 was moved from the SHC to the TCS (no
target installed). |
|
2511
|
Friday, December 15, 2023, 11:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#58 | Pail repack, transfer to mini-storage vault | Pail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell. |
|
2516
|
Monday, January 08, 2024, 14:47 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - ITW to SHC | TM2 was moved from ITW to the South Hot
Cell with Ta#66 target. |
|
2517
|
Tuesday, January 09, 2024, 16:10 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - SHC to Silo | TM2 was moved with no target attached from
the South Hot Cell to a silo. |
|
2540
|
Friday, February 09, 2024, 12:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58. |
|
2542
|
Wednesday, February 14, 2024, 11:32 |
Adam Newsome | Spent Target Vault | Standard Operation | | UCx#43 | Spent Target Move | Spent target UCx#43 (pail 289) was moved
from the South Hot Cell to the Storage Vault,
placed in location 2A. Dose rate at 1m was |
|
2543
|
Wednesday, February 14, 2024, 11:34 |
Adam Newsome | Spent Target Vault | Standard Operation | | Misc. | Three pails moved from main vault to mini vault | In preparation for F-308 loading, three
pails were moved from the main storage vault
to the mini storage vault. The following |
|