  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2

Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.

  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHT

Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for remote operation and tested successfully with low current (30 A).

  2204   Thursday, March 25, 2021, 08:55 Anders MjosConditioning StationMaintenance  Filters inspected and cleaned on water circuit

By Curtis. See Work Permit I2021-03-24-1 for details.

  2207   Monday, April 12, 2021, 13:45 Anders MjosCoolingMaintenance  New T installed for instrumentation loop on HALCW system

Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4

Attachment 1: MicrosoftTeams-image_(9).png
MicrosoftTeams-image_(9).png
  2208   Monday, April 12, 2021, 13:47 Anders MjosAssembly/Bench TestRepairTM4 Steerer wiring

Travis assembled and tested the steerer wires March 31st (see attached)

Attachment 1: TM4_Steerers_electric_check.pdf
TM4_Steerers_electric_check.pdf
  2218   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  Chiller maintenance

A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will contact Plant Group with a quote for repair and upgrades.

  2219   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  TK2 refilled

Tank refilled from 12 in to 25 in using the new valve.

  2764   Tuesday, February 04, 2025, 11:50 Alexander ShkuratoffITWStandard Operation  ITW HV bias test without module (Work permit I2025-02-03-2)

Tuesday, February 04, 2025, 10:15

  • Started voltage ramp up. Using 250 V increments.

 Tuesday, February 04, 2025, 12:07

  • Current has got a bit noisy, starting at around 56.5 kV.
  • Currently at 57 kV. Voltage is stable though.
    • Current is about 151 uA on average, with spikes up to 164 uA.
  • Held at 57 kV for about 5 minutes, no drops in voltage, so continuing ramp.
  • 57.25 kV
    • There is noise in the current each time the voltage is increased. It seems to calm down slowly, with the later noise/spikes being less frequent and lower magnitude.
    • Average current is about 151 uA. Spikes at the start were as high as 169 uA, and after about 8 minutes they are about 160 uA.
    • Held here for about 10 minutes before continuing ramp.
  • I will try to get to 58 kV, and then back down to 57 kV to see if the current calms down and there is some sort of conditioning effect. If there is, I'm not sure of the mechanism since nothing is in vacuum.

Tuesday, February 04, 2025, 12:51

  • Dropping down to 57 kV, the current was about 150 uA and there were no more noise spikes. Seems like conditioning. Going back to 58 kV and continuing ramp.

Tuesday, February 04, 2025, 13:09

  • At 60 kV. Average current is about 187 uA initially, which could just be the average of the noise. It looks like it's dropping a few minutes later. About 10 minutes later, the current is 184 uA. 181 uA after 20 minutes.
  • It's been stable for about 30 minutes now. No voltage fluctuations, noise in the current has been the same or decreasing.
  • Current is about 177 uA after 80 minutes.

Tuesday, February 04, 2025, 14:36

  • It's been 1.5 hours and the voltage has been stable the whole time. All is good. Ramping down.

Tuesday, February 04, 2025, 14:50

  • Power supply off
  • Data dumped to http://isacwserv.triumf.ca/onlylocal/isacdata/ITW_HV_test_shutdown2025.txt

 

  2765   Wednesday, February 05, 2025, 13:46 Alexander ShkuratoffITEStandard Operation  ITE HV bias test without module (Work permit I2025-02-03-2)

Wednesday, February 05, 2025, 12:20

  • Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.

Wednesday, February 05, 2025, 12:45

  • Current was quite stable with basically no noise, and increasing with voltage until 57.5 kV, when the current spiked from 180 uA to a peak of 308 uA and the voltage dropped a little bit for a single data point. Kept it here for a few second and then dropped it back down a couple steps. Currently at 57 kV and the average current is about the same as before (181 uA), but the noise is significantly higher (+/- 10 uA).
  • Been at 57 kV for about 5 minutes and no change in the noise. Will try continuing ramp.
  • 57.25 kV: Current is ~193 uA with +/- 20 uA noise.
  • Gonna go with 250 V step every 5 minutes from here on until 60 kV.
Voltage (kV) Current (uA)
Noise (uA) V drops in 5 mins Current of spikes (uA)
57.00 181 10 0 -

57.25

193 20 0 -
57.50 206 25 1 294
57.75 216 15 0 -

58.00

225 10 4 876, 993, 873, 995

58.25

    30+ too many to count
58.50        

Wednesday, February 05, 2025, 13:17

  • Seemed like it was having some trouble at 58 kV, and then at 58.25 kV it was fine for about a minute and just starting sparking constantly, and would not calm down after a minute. Some sparks caused a positive voltage swing up to 65 kV, and with currents as high as ~4000 uA.
  • Ramped voltage down in steps back to 56.75 kV. It's still getting about 10-11 sparks per 5 minutes.
  • Trying 56.5 kV. 8 sparks in 5 minutes, one positive.
  • Trying 56.25 kV. 3 very small voltage drops in 5 minutes.
  • Trying 56 kV. No voltage drops in 5 minutes. Current is on average ~204 uA, with +/- 20 uA of noise.

Wednesday, February 05, 2025, 15:02

  • 1.5 hours at 56 kV. 2 small sparks over this time. Current was about 195 uA on average with about +/- 20 uA of noise. A spark will usually result in a change of the average current following the spark until the next.
  • Ramping down voltage now. The amount of noise decreases quickly with voltage and is basically gone at 53 kV.
  • Power supply off.
  • Dumped data to https://isacwserv.triumf.ca/onlylocal/isacdata/ITE_HV_test_shutdown2025.txt

Conclusion: ITE seems good up to 56 kV.

  1925   Friday, May 17, 2019, 16:46 Adam NewsomeSafe Module ParkingDevelopment  SMP Controls Installation Update

 

The following controls-related items were installed for the SMP project:

- Cable tray

- Main control panel

- Motor starter box

- Wiring from limit switches and rotation motor to main control panel

- Air fittings at supply (quick disconnect)

- Main air supply hose from supply to control panel (quick disconnect)

- Air tubing from lid control valve at control panel to lid cylinders

 

Air fittings stem off existing air supply lines on the South wall, below a manual shutoff valve. A quick disconnect was installed. When SMP is not in use, manual shutoff valve should be left off.

 

Main control panel and motor starter box were mounted on the North wall. Wire duct runs from the main control panel to the grated floor. Cabling/air runs underneath the mezzanine platform, along existing and new cable tray, to the SMP.

 

Cable tray was installed on the South wall, from the corner to the SMP module. A cutout was made to accommodate for existing tubing. An additional ~1 ft. of tray will be added to the end, near the corner, at a future time.

 

Remainder of installation work to be done before commissioning:

- Mount and install new Opto-22 module
- Chain new Opto-22 module to existing one (power, comms) below mezzanine on North wall

Attachment 1: IMG_20190417_100838.jpg
IMG_20190417_100838.jpg
Attachment 2: IMG_20190417_100843.jpg
IMG_20190417_100843.jpg
Attachment 3: IMG_20190517_162230.jpg
IMG_20190517_162230.jpg
Attachment 4: IMG_20190517_162305.jpg
IMG_20190517_162305.jpg
  1952   Monday, July 22, 2019, 14:51 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 Move

TM4 has been moved from the South West silo to the South Hot Cell. New source tray, no target.

  1957   Wednesday, July 31, 2019, 08:57 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 Move

TM4 has been moved from the Conditioning Station to the South Hot Cell. No target.

  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 Move

TM2 was moved from ITE to South Hot Cell. Tantalum 58 target.

  1963   Thursday, August 15, 2019, 09:36 Adam NewsomeITEStandard OperationTM2ZrC #8TM2 Move

TM2 was moved from South Hot Cell to ITE. ZrC #8 target.

  1971   Tuesday, August 27, 2019, 13:12 Adam NewsomeSafe Module ParkingDevelopment  SMP Remote Control Wiring Inspection

The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF electrician). The module was plugged in to verify there were no issues. No changes were suggested, and then wiring was approved.

  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the Middle-East silo to the South Hot Cell.

  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the South Hot-Cell to the Middle-East silo.

  1974   Tuesday, September 03, 2019, 10:49 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 Move

TM4 has been moved from the Conditioning Station to the South Hot-Cell.

  1977   Thursday, September 05, 2019, 14:18 Adam NewsomeSouth Hot-CellStandard OperationTM4UCx#27TM4 Move

TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station.

  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 Move

TM4 has been moved from the Conditioning Station to ITW with UC#27 target.