Entry  Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2 
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.
Entry  Thursday, August 27, 2020, 13:18, Anders Mjos, Conditioning Station, Maintenance, TM2, , New Power Supply installed for TGHT 
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for
remote operation and tested successfully with low current (30 A).
Entry  Thursday, March 25, 2021, 08:55, Anders Mjos, Conditioning Station, Maintenance, , , Filters inspected and cleaned on water circuit 
By Curtis. See Work Permit I2021-03-24-1 for details.
Entry  Monday, April 12, 2021, 13:45, Anders Mjos, Cooling, Maintenance, , , New T installed for instrumentation loop on HALCW system MicrosoftTeams-image_(9).png
Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4
Entry  Monday, April 12, 2021, 13:47, Anders Mjos, Assembly/Bench Test, Repair, TM4, , Steerer wiring TM4_Steerers_electric_check.pdf
Travis assembled and tested the steerer wires March 31st (see attached)
Entry  Tuesday, May 25, 2021, 16:20, Anders Mjos, Conditioning Station, Maintenance, , , Chiller maintenance 
A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will
contact Plant Group with a quote for repair and upgrades.
Entry  Tuesday, May 25, 2021, 16:20, Anders Mjos, Conditioning Station, Maintenance, , , TK2 refilled 
Tank refilled from 12 in to 25 in using the new valve.
Entry  Tuesday, February 04, 2025, 11:50, Alexander Shkuratoff, ITW, Standard Operation, , , ITW HV bias test without module (Work permit I2025-02-03-2) 
Tuesday, February 04, 2025, 10:15

    Started voltage ramp up. Using 250 V increments.

 Tuesday, February 04, 2025, 12:07

    Current has got a bit noisy, starting at around 56.5 kV.
    Currently at 57 kV. Voltage is stable though.
    
   
Entry  Wednesday, February 05, 2025, 13:46, Alexander Shkuratoff, ITE, Standard Operation, , , ITE HV bias test without module (Work permit I2025-02-03-2)  
Wednesday, February 05, 2025, 12:20

    Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.

Wednesday, February 05, 2025,
12:45
Entry  Friday, May 17, 2019, 16:46, Adam Newsome, Safe Module Parking, Development, , , SMP Controls Installation Update IMG_20190417_100838.jpgIMG_20190417_100843.jpgIMG_20190517_162230.jpgIMG_20190517_162305.jpg
 
The following controls-related items were installed for the SMP project:
- Cable tray
Entry  Monday, July 22, 2019, 14:51, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move 
TM4 has been moved from the South West silo to the South Hot Cell. New source tray, no target.
Entry  Wednesday, July 31, 2019, 08:57, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move 
TM4 has been moved from the Conditioning Station to the South Hot Cell. No target. 
Entry  Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move 
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. 
Entry  Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move 
TM2 was moved from South Hot Cell to ITE. ZrC #8 target. 
Entry  Tuesday, August 27, 2019, 13:12, Adam Newsome, Safe Module Parking, Development, , , SMP Remote Control Wiring Inspection 
The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF  electrician).  The module was plugged in to verify there were no
issues. No changes were suggested, and then wiring was approved.
Entry  Thursday, August 29, 2019, 12:54, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move 
TM3 has been moved from the Middle-East silo to the South Hot Cell.
Entry  Tuesday, September 03, 2019, 10:48, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move 
TM3 has been moved from the South Hot-Cell to the Middle-East silo. 
Entry  Tuesday, September 03, 2019, 10:49, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move 
TM4 has been moved from the Conditioning Station to the South Hot-Cell.
Entry  Thursday, September 05, 2019, 14:18, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UCx#27, TM4 Move 
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. 
Entry  Tuesday, September 10, 2019, 10:10, Adam Newsome, ITW, Standard Operation, TM4, UC#27, TM4 Move 
TM4 has been moved from the Conditioning Station to ITW with UC#27 target.