2140
|
Thursday, August 27, 2020, 09:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | Ta#60 | Refilled TK2 | Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve. |
|
2142
|
Thursday, August 27, 2020, 13:18 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | New Power Supply installed for TGHT | Arthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power |
|
2204
|
Thursday, March 25, 2021, 08:55 |
Anders Mjos | Conditioning Station | Maintenance | | | Filters inspected and cleaned on water circuit | By Curtis. See Work Permit I2021-03-24-1
for details. |
|
2207
|
Monday, April 12, 2021, 13:45 |
Anders Mjos | Cooling | Maintenance | | | New T installed for instrumentation loop on HALCW system | Adrian and co installed a new T to be able
to add an instrument loop for O2 and pH monitoring
on the low conductivity water systtem (photo). |
|
2208
|
Monday, April 12, 2021, 13:47 |
Anders Mjos | Assembly/Bench Test | Repair | TM4 | | Steerer wiring | Travis assembled and tested the steerer
wires March 31st (see attached) |
|
2218
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | A contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used. |
|
2219
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 refilled | Tank refilled from 12 in to 25 in using
the new valve. |
|
2764
|
Tuesday, February 04, 2025, 11:50 |
Alexander Shkuratoff | ITW | Standard Operation | | | ITW HV bias test without module (Work permit I2025-02-03-2) | Tuesday, February 04, 2025, 10:15
Started voltage ramp up.
Using 250 V increments.
Tuesday, |
|
2765
|
Wednesday, February 05, 2025, 13:46 |
Alexander Shkuratoff | ITE | Standard Operation | | | ITE HV bias test without module (Work permit I2025-02-03-2) | Wednesday, February 05, 2025, 12:20
Ed has the voltage already
up to 1000 V. Starting further ramp up in |
|
1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related |
   |
1952
|
Monday, July 22, 2019, 14:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target. |
|
1957
|
Wednesday, July 31, 2019, 08:57 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
|
|
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move | TM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. |
|
1963
|
Thursday, August 15, 2019, 09:36 |
Adam Newsome | ITE | Standard Operation | TM2 | ZrC #8 | TM2 Move | TM2 was moved from South Hot Cell to ITE.
ZrC #8 target. |
|
1971
|
Tuesday, August 27, 2019, 13:12 |
Adam Newsome | Safe Module Parking | Development | | | SMP Remote Control Wiring Inspection | The wiring for the SMP remote control module
was inspected by Joel Semilla (TRIUMF electrician).
The module was plugged in to verify there |
|
1972
|
Thursday, August 29, 2019, 12:54 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move | TM3 has been moved from the Middle-East
silo to the South Hot Cell. |
|
1973
|
Tuesday, September 03, 2019, 10:48 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move | TM3 has been moved from the South Hot-Cell
to the Middle-East silo. |
|
1974
|
Tuesday, September 03, 2019, 10:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot-Cell. |
|
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move | TM4 with UCx#27 target has been moved from
the South Hot-Cell to the Conditioning Station.
|
|
1982
|
Tuesday, September 10, 2019, 10:10 |
Adam Newsome | ITW | Standard Operation | TM4 | UC#27 | TM4 Move | TM4 has been moved from the Conditioning
Station to ITW with UC#27 target. |
|