  RH-ISAC, Page 133 of 140  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2505   Thursday, November 23, 2023, 11:15 Adam NewsomeCraneRepair  Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker]It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow,
  
  2506   Monday, November 27, 2023, 12:01 chad fisherSouth Hot-CellMaintenance  Manipulator tong cable and wrist replacementBroken tong cable on SW manipulator (serial
#8106) of SHC was replaced today. 
Following ISAC Hot Cell entry procedure,
  
  2507   Tuesday, November 28, 2023, 12:58 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - Silo to SHCTM3 was moved from the Silo to South Hot
Cell. 
  
  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped downPumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator
  
  2509   Wednesday, December 13, 2023, 11:42 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - TCS TO SHCTM3 has been moved from the target conditioning
station to the south hot cell. 
  
  2510   Friday, December 15, 2023, 11:07 Adam NewsomeConditioning StationStandard OperationTM3 TM3 Move - SHC to TCSTM3 was moved from the SHC to the TCS (no
target installed). 
  
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  2513   Tuesday, January 02, 2024, 16:01 Carla BabcockConditioning StationDevelopmentTM3 TM3 service tray HV testing and conditioningTuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service
tray about 3pm today. Had to bypass TCS:BIAS
 Screenshot_from_2024-01-02_16-05-43.pngScreenshot_from_2024-02-08_17-57-50.png 
  2516   Monday, January 08, 2024, 14:47 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - ITW to SHCTM2 was moved from ITW to the South Hot
Cell with Ta#66 target. 
  
  2517   Tuesday, January 09, 2024, 16:10 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - SHC to SiloTM2 was moved with no target attached from
the South Hot Cell to a silo. 
  
  2520   Thursday, January 11, 2024, 13:54 David WangConditioning StationDevelopmentTM3 TM3 servic cap air to vacumm seals leak check.After Tm3 service tray and service cap
installation, TM3 service cap air to vacuum
seals leak check has been done at TCS. TCS:IG1
  
  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.ITW entrance module has been disconnected
per document190510. It will be moved to SHC
for diagnostic group tomorrow. 
  
  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC. ITW entrance module has been moved from
ITW to SHC. The move is smooth.  I cleaned
entrance module tank flange and o r-ing slot. 
  
  2525   Monday, January 22, 2024, 09:50 David WangITWStandard Operation  ITW entrance module has been moved from SHC to ITW.ITW entrance module has been moved from
SHC to ITW. A slightly bump on module shielding
block bottom side corner to tank vessel side
  
  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.Entrance module has been connected in ITW
pit per document 190510 " entrance module
disconnection and removal procedure".
  
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and   plates ITA6550-01
yesterday. He certified the use of these
  
  2533   Friday, January 26, 2024, 08:30 David WangSouth Hot-CellStandard OperationTM4 window line VCR leak check after containment box removal/installation. Chad and I did window line VCRs leak check
after containment box removal/installation. 
The first  pair of  VCRs have leak.
  
  2534   Friday, January 26, 2024, 11:53 David WangSafe Module ParkingStandard OperationTM4 Tm4 has been moved to SMP.TM4 has been moved to SMP. The move is
smooth. I started SMP vacuum pump. The TM4
and SMP vessel is under vacuum now. 
  