2505
|
Thursday, November 23, 2023, 11:15 |
Adam Newsome | Crane | Repair | | | Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker] | It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow, |
|
2506
|
Monday, November 27, 2023, 12:01 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator tong cable and wrist replacement | Broken tong cable on SW manipulator (serial
#8106) of SHC was replaced today.
Following ISAC Hot Cell entry procedure, |
|
2507
|
Tuesday, November 28, 2023, 12:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - Silo to SHC | TM3 was moved from the Silo to South Hot
Cell. |
|
2508
|
Wednesday, November 29, 2023, 12:45 |
Carla Babcock | ITE | Standard Operation | | | gas lines pumped down | Pumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator |
|
2509
|
Wednesday, December 13, 2023, 11:42 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - TCS TO SHC | TM3 has been moved from the target conditioning
station to the south hot cell. |
|
2510
|
Friday, December 15, 2023, 11:07 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 Move - SHC to TCS | TM3 was moved from the SHC to the TCS (no
target installed). |
|
2512
|
Thursday, December 21, 2023, 09:37 |
Ferran Boix Pamies | ITE | Development | | | Rewiring of TC multiping wires | Thursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger |
|
2513
|
Tuesday, January 02, 2024, 16:01 |
Carla Babcock | Conditioning Station | Development | TM3 | | TM3 service tray HV testing and conditioning | Tuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service
tray about 3pm today. Had to bypass TCS:BIAS |
 |
2516
|
Monday, January 08, 2024, 14:47 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - ITW to SHC | TM2 was moved from ITW to the South Hot
Cell with Ta#66 target. |
|
2517
|
Tuesday, January 09, 2024, 16:10 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - SHC to Silo | TM2 was moved with no target attached from
the South Hot Cell to a silo. |
|
2520
|
Thursday, January 11, 2024, 13:54 |
David Wang | Conditioning Station | Development | TM3 | | TM3 servic cap air to vacumm seals leak check. | After Tm3 service tray and service cap
installation, TM3 service cap air to vacuum
seals leak check has been done at TCS. TCS:IG1 |
|
2521
|
Thursday, January 11, 2024, 13:57 |
David Wang | ITW | Standard Operation | | | ITW entrance module has been disconnect. | ITW entrance module has been disconnected
per document190510. It will be moved to SHC
for diagnostic group tomorrow. |
|
2522
|
Friday, January 12, 2024, 10:53 |
David Wang | South Hot-Cell | Standard Operation | | | ITW entrance module has been moved from ITW to SHC. | ITW entrance module has been moved from
ITW to SHC. The move is smooth. I cleaned
entrance module tank flange and o r-ing slot. |
|
2525
|
Monday, January 22, 2024, 09:50 |
David Wang | ITW | Standard Operation | | | ITW entrance module has been moved from SHC to ITW. | ITW entrance module has been moved from
SHC to ITW. A slightly bump on module shielding
block bottom side corner to tank vessel side |
|
2526
|
Monday, January 22, 2024, 09:56 |
David Wang | ITW | Standard Operation | | | Entrance module has been connected in ITW pit. | Entrance module has been connected in ITW
pit per document 190510 " entrance module
disconnection and removal procedure". |
|
2530
|
Thursday, January 25, 2024, 07:24 |
David Wang | Crane | Standard Operation | | | targe hall annual crane inspection | Tom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom has
this inspection record in his file. The crane |
|
2531
|
Thursday, January 25, 2024, 07:27 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2532
|
Thursday, January 25, 2024, 07:31 |
David Wang | Crane | Standard Operation | | | Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2533
|
Friday, January 26, 2024, 08:30 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | window line VCR leak check after containment box removal/installation. | Chad and I did window line VCRs leak check
after containment box removal/installation.
The first pair of VCRs have leak. |
|
2534
|
Friday, January 26, 2024, 11:53 |
David Wang | Safe Module Parking | Standard Operation | TM4 | | Tm4 has been moved to SMP. | TM4 has been moved to SMP. The move is
smooth. I started SMP vacuum pump. The TM4
and SMP vessel is under vacuum now. |
|