Friday, December 16, 2022, 16:35, Adam Newsome, Spent Target Vault, Standard Operation, , , Pails measured, moved to mini-storage vault
|
The following five pails were moved to the mini-storage vault today under work permit I2022-12-16-1:
#239 (formerly vault location 7A): 1.38 mSv/h @ 1m
#245 (formerly vault location 6B): 1.56 mSv/h @ 1m
#264
(formerly vault location 6A): 748 uSv/h @ 1 m
#267 (formerly vault location 1C): 708 uSv/h @ 1 m
#268 (vault location 7C): |
Friday, December 16, 2022, 16:39, Adam Newsome, Crane, Standard Operation, , , Crane powered off for holidays
|
[edit 2023-01-03] The crane was powered back on this morning - there do not appear to be any faults and it seems that the crane was unaffected by the
power outage.
The ISAC target hall overhead crane was powered off for the holidays. Note that this may result in the commonly observed PLC battery failure issue |
Friday, January 06, 2023, 09:41, Adam Newsome, Spent Target Vault, Standard Operation, , , Pails moved to mini-storage vault
|
The following three pails were moved from the main storage vault to the mini-storage vault:
1. #211, Ta#58 (formerly vault location 3C)
2. #217, ZrC#8 (formerly vault location 3A) |
Friday, January 06, 2023, 10:38, David Wang, ITW, Standard Operation, TM2, , ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.
|
ITW
and TM2 primary and secondary vacuum vessel leak check is done. Leak detector is connected to ITW TP1. Base leak rate on leak detector is 0.0 x E-9
atm.cc/sec. See attachment for the result. No big issue. Two old leaks we found last year at location D and E disappeared in this check. |
Tuesday, January 24, 2023, 07:21, David Wang, ITW, Maintenance, , , ITW pit general clean up.
|
ITW was cleaned with vacuum canister in Jan 10th. HV cage inside and blue nylon insulators were wiped. Garbage inside the pits
were cleaned out. |
Tuesday, January 24, 2023, 07:26, David Wang, Conditioning Station, Standard Operation, , , TH floor moping and garbage collelctions.
|
Plant group and us finished TH floor mopping and garbage collections last Wednesday. Th moping head had 800 count after using. all garbage were
bagged , checked, tagged, and sent to radwaste area. |
Friday, January 27, 2023, 07:11, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done.
|
Tom Kauss inspected target hall crane yesterday. The crane works fine. Tom has this inspection record in his file. The inspection tag has been issued.
|
Friday, January 27, 2023, 07:15, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done.
|
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection
tag has been issued for 2023. |
Friday, January 27, 2023, 07:18, David Wang, Crane, Standard Operation, , , Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for
2023. Inspection tags have been issued and attached to frames. He has inspection record on them. |
Friday, January 27, 2023, 07:25, David Wang, Crane, Standard Operation, , , Inspection of TH crane below hook attachment pins and plates ITA6550-01
|
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates. The
inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.
After inspection, The inspection tag was issued and attached to pin. Tom has an inspection record on this job |
Monday, February 13, 2023, 09:57, David Wang, ITW, Maintenance, , , ITW/ITE primary vacuum back up lines and BVs leak check in target pit.
|
In past two weeks, ITW/ ITE primary vacuum back up lines and BVs in ITW/ITE pit have been leak checked. ITW BV1 and BV2 on back up line side were
leak. They are replaced with old leak free BVs. ITE TP2 NW25 SST flexible line right after pump were leak . It is replaced with new NW25 SST
flexible line. Two leak were found on ITW side KF 50 O-rings connected to NW 50 SST flexible coupling. They were replaced with new KF50 o-rings. After |
Tuesday, February 14, 2023, 11:36, David Wang, Assembly/Bench Test, Repair, , , Turbo pump BVs o-ring replacement.
|
Five of used internal leaked TP BVs are serviced and repaired. Internal plunge o-ring and case o-ring are replaced on all five BVs.
Leak checked valves after . They are ok to be used as spare parts. The are active parts stored in TH now. |
Wednesday, February 22, 2023, 09:22, Carla Babcock, ITE/ITW, Standard Operation, , , HV testing of ITE/ITW
|
Feb. 16 2023: HV tests done on ITE station. Ramped up to 59kV but was not stable there, current draw was very unstable and was sparking every ~6mins.
Ramped down to 58kV and it was stable there for 3 hours drawing 285uA.
Feb. 24 2023: HV tests done on ITW station. Ramped easily to 60kV with no sparking - suspicious. Has been stable at 60kV for 45mins with no sparks |
Wednesday, March 01, 2023, 09:27, David Wang, Cooling, Maintenance, , , Two filters on HALCW resin circuit have been replaced.
|
Two filters on HALCW resin circuit have been replaced. O-ring 235# were changed on both filter cartridge houses. 25micron 10"x 2.5"
3M cartridge new filters are used. Old filters are not very dirty. They are bagged and stored in vacuum pit. Residual water from cartridge houses
are collected and stored in high active storage jug with sealed cap. No leak on resin circuit before and after the job. |
Wednesday, March 01, 2023, 09:34, David Wang, Cooling, Maintenance, , , Visual inspection of HALCW for possible small water leak or drip.
|
I visually inspected HALCW system including water station section, both target pits, and de-ionizer system. No small leak and drip was found .
The inspection in both target pits will be repeated after flow sensors are replaced. |
Wednesday, March 01, 2023, 10:01, David Wang, ITE/ITW, Development, , , vacuum pit ventilation upgrade.
|
vacuum pit ventilation upgrade was done last week. The jobs include: installed two industrial cooling fans. One is placed in pit on resin
tan cover. Other one is placed on and opening to pit by shielding blocks. They are installed for better air circulation in pit. Also, 2x two
small 20W cooling fans are installed on ITH MP1 and MP1S to low the pump operation temperature. The result is positive. The ventilation status |
Monday, March 06, 2023, 11:31, Adam Newsome, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair
|
The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021
that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it
was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. |
Tuesday, March 07, 2023, 10:37, chad fisher, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair
|
Adam Newsome wrote:
The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced |
Wednesday, March 08, 2023, 06:32, David Wang, Cooling, Maintenance, , , HALCW flow sensors replacement.
|
HALCW flow sensors replacement job is done. All ITE/ITW(except ITE HS) return line water flow sensors including paddle wheels and coils are replaced.
After job, water interlock signal have been checked in electrical room . Everything works fine. Visually inspections for possible water leak on HCLCW
system have been done as well. one valve on ITE dump return line has a very small water seeping through valve stem. I will watch on it. Other than |
Wednesday, March 08, 2023, 09:19, David Wang, Cooling, Standard Operation, , , HALCW ITC:MP1/MP2 motor phase current measurement.
|
HALCW ITC:MP1/MP2 motor phase current measurement is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A. MP2: 17.9A/17.9A/17.3A.
19.5A is manufacturer notified on full load phase current.on operating instruction manual. |
|