  RH-ISAC, Page 12 of 135  Not logged in ELOG logo
Entry  Monday, January 22, 2024, 14:12, Frank Song, ITE, Standard Operation, TM4, UCx#43, module disconnection TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
 TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls.
Entry  Monday, January 22, 2024, 10:16, David Wang, ITE, Standard Operation, TM4, UCx#, Tm4 waterlines helium pressure test and TM service cap helium leak check. 
Tm4 waterlines helium pressure test and TM service cap helium leak check was done last Friday. All water lines were pressurized with 70psi helium for
3 minutes each. The 3 minutes stable leak rate on all lines are less than 4.0 X E-9atm.cc/sec. some of lines had surging leak rate to 2xE-8 atm.cc/sec
at the first 10 seconds of pressurization which should be a gas hammer result at the beginning. Based on the numbers, I would say all water lines are leak
Entry  Monday, January 22, 2024, 09:56, David Wang, ITW, Standard Operation, , , Entrance module has been connected in ITW pit. 
Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".
 
Entry  Monday, January 22, 2024, 09:50, David Wang, ITW, Standard Operation, , , ITW entrance module has been moved from SHC to ITW. 
ITW entrance module has been moved from SHC to ITW. A slightly bump on module shielding block bottom side corner to tank vessel side when lowed module
into tank. No big concern on this slight  bumping. Otherwise the move is perfect. 
 
Entry  Wednesday, January 17, 2024, 20:09, Carla Babcock, South Hot-Cell, Standard Operation, , Ta#66, Ta#66 post irradiation inspection 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg
On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling
off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing
it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked
Entry  Friday, January 12, 2024, 11:25, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#66, Ta#66 post operation electrical check at SHC TM2_Ta66_post__oeration_electrical_check.pdf
Ta#66 post operation electrical check was done at SHC this Monday. See attachment. 
Entry  Friday, January 12, 2024, 10:53, David Wang, South Hot-Cell, Standard Operation, , , ITW entrance module has been moved from ITW to SHC.  
ITW entrance module has been moved from ITW to SHC. The move is smooth.  I cleaned entrance module tank flange and o r-ing slot.  entrance
module tank flange o ring  is replaced . 
Entry  Thursday, January 11, 2024, 13:57, David Wang, ITW, Standard Operation, , , ITW entrance module has been disconnect. 
ITW entrance module has been disconnected per document190510. It will be moved to SHC for diagnostic group tomorrow. 
Entry  Thursday, January 11, 2024, 13:54, David Wang, Conditioning Station, Development, TM3, , TM3 servic cap air to vacumm seals leak check. 
After Tm3 service tray and service cap installation, TM3 service cap air to vacuum seals leak check has been done at TCS. TCS:IG1 and IG1S are at low
E-7 torr range.  leak detector base  0.0XE-9 atm.cc/sec,  base pressure0.0X E-4 torr.  I sprayed helium to all new air to vacuum seals
on service cap. No leak on seals. The leak check has been repeated  2 times with same result.    
Entry  Wednesday, January 10, 2024, 16:51, Carla Babcock, ITE, Standard Operation, TM4, UCx#43, UCx#43 failure 
 To deliver stable beam to RadMol, started heating UCx#43 up again. Target was overheated during initial conditioning in Nov but then ran well for
4 weeks. During the run time, the TGHT voltage jumped around and this was reflected in the ion current, but yields seemed unaffected.
When re-heating it, the TGHT voltage was very unstable and once it got to 440A, it went into voltage limiting mode. We ramped down and it was still
Entry  Wednesday, January 10, 2024, 11:24, Travis Cave, Spent Target Vault, Standard Operation, , Ta#66, Spent Target Move Target_Index_2023-01-10.pdf
 The spent Ta#66 was moved from the south hot cell to the spent target vault, it was placed in pail#285 and placed in spot 5B of the vault. The
target was 46.2mSv/hr when removed from the south hot cell. See the attached PDF for vault details.
Entry  Tuesday, January 09, 2024, 16:10, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - SHC to Silo 
TM2 was moved with no target attached from the South Hot Cell to a silo. 
Entry  Monday, January 08, 2024, 14:47, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - ITW to SHC 
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. 
Entry  Wednesday, January 03, 2024, 14:03, David Wang, ITW, Standard Operation, TM2, Ta#66, ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.  ITW_2024_shut_down_leak_check.pdf
ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small
air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other
water lines are below 3.0XE-9atm.cc/sec. 
Entry  Wednesday, January 03, 2024, 13:55, David Wang, ITW, Standard Operation, TM2, Ta#66, Disconnect TM2 in ITW. TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.
Entry  Tuesday, January 02, 2024, 16:01, Carla Babcock, Conditioning Station, Development, TM3, , TM3 service tray HV testing and conditioning Screenshot_from_2024-01-02_16-05-43.pngScreenshot_from_2024-02-08_17-57-50.png
Tuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service tray about 3pm today. Had to bypass TCS:BIAS interlocks to make it work - there are some flow restrictions on
the water lines that are causing the flow interlock to periodically trigger. The water flow it not very important for this test as long as the water is
Entry  Thursday, December 21, 2023, 09:37, Ferran Boix Pamies, ITE, Development, , , Rewiring of TC multiping wires 
Thursday, December 21, 2023, 09:36. ITE multipin wires 12-13-14-15 were rewired from the RF driver box to a TC datalogger inside the HV cage. A
webcam was also installed to monitor the TC values during operation. This is only a temporary setup to be upgraded during shutdown.
Entry  Friday, December 15, 2023, 11:31, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#58, Pail repack, transfer to mini-storage vault Target_Index_2023-12-15.pdf
Pail 211 which contained Ta#58 spent target was repackaged into Pail 286 in the South Hot Cell.
The dose rate at approx. 1 m was 4.16 mSv/h.
Pail 286 was transferred to the mini-storage vault and placed in the outermost location. The mini-storage vault is full at this time, in preparation
Entry  Friday, December 15, 2023, 11:07, Adam Newsome, Conditioning Station, Standard Operation, TM3, , TM3 Move - SHC to TCS 
TM3 was moved from the SHC to the TCS (no target installed). 
Entry  Wednesday, December 13, 2023, 11:42, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - TCS TO SHC 
TM3 has been moved from the target conditioning station to the south hot cell. 