  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2266   Wednesday, November 10, 2021, 11:06 Travis CaveSpent Target VaultStandard Operation C#3Spent Target Move The spent C#3 target has been moved
from the south hot cell to the spent target
vault it was placed in pail #270 and put
 Target_Index_2021-11-10.pdf 
  2267   Monday, November 15, 2021, 12:00 Travis CaveSpent Target VaultStandard Operation Ta#53Repacking of the target. Ta#53 was repacked and placed in
the mini vault it was changed from pail#164
to pail#262. See attached PDF for further
 Target_Index_2021-11-15.pdfTarget_Index_2021-11-15_mini_vault.pdf 
  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tensionIt was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present.
 PXL_20211119_190640081.jpg 
  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets. Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details.
 Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf 
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached
 Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf 
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installationA rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit
 PXL_20211119_172142852.jpg 
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004hAn issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however
 Fault_code_when_connecting_Nov_22_2021.png 
  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target MoveThe spent UC#35 target has been moved from
the south hot cell to the  spent target vault.
It was placed in pail #264 and put in spot
 Target_Index_2021-11-26.pdf 
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal
  
  2290   Wednesday, January 12, 2022, 14:09 Travis CaveSpent Target VaultStandard Operation UC#36Spent Target Move The spent UC#36 target in the north
hot cell has been removed and placed in the
spent target vault. See attached PDF for
 Target_Index_2022-01-12.pdf 
  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames.
 2022-01-19_170.jpg2022-01-19_173.jpg2022-01-19_175.jpg2022-01-19_176.jpg 
  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection. Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates.
 2022-01-19_174.jpg2022-01-19_172.jpg 
  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target MoveThe spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and 
 Target_Index_2022-01-20.pdf 
  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional checkTH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine.
  
  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister. ITE/ITW  are cleaned with vacuum canister.
HV  cage inside and blue nylon insulators
are wiped.  Garbage inside the pits
  
  2300   Tuesday, January 25, 2022, 12:49 David WangITE/ITWStandard Operation  Target station vacuum system visual inspection. Two shielding blocks  above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and
  
  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection. Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag
  
  2302   Thursday, February 10, 2022, 11:45 David WangSpent Target VaultStandard Operation UCx#33.Spent target UCx #33 has been repacked with a new pail and lid in NHC. Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot
  
  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.   Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up
  