2267
|
Monday, November 15, 2021, 12:00 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Repacking of the target. | Ta#53 was repacked and placed in
the mini vault it was changed from pail#164
to pail#262. See attached PDF for further |
|
2268
|
Monday, November 15, 2021, 12:15 |
Adam Newsome | South Hot-Cell | Repair | | | Squeaking noise during turntable rotation - chain misalignment and improper tension | It was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present. |
|
2269
|
Wednesday, November 17, 2021, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Repacking of the targets. | Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details. |
|
2270
|
Thursday, November 18, 2021, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#38 and UC#29 | Spent Target Move | The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached |
|
2271
|
Friday, November 19, 2021, 12:48 |
Adam Newsome | South Hot-Cell | Development | | | Vertical motion limit switch installation | A rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit |
|
2272
|
Monday, November 22, 2021, 12:44 |
Adam Newsome | Crane | Repair | | | Crane PLC Fault: 0004h | An issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however |
|
2278
|
Friday, November 26, 2021, 10:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#35 | Spent Target Move | The spent UC#35 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail #264 and put in spot |
|
2279
|
Monday, November 29, 2021, 12:16 |
David Wang | Spent Target Vault | Standard Operation | | | Five spent targets have been loaded into F308s | We loaded UCx #29 , SiC #38 , Ta#53,
Ta#56 ,and Ta#57 from mini storage
into F308 flasks. Later, the flasks |
|
2288
|
Tuesday, January 11, 2022, 11:50 |
David Wang | ITW | Maintenance | | | ITW Exit module 1 side sqaure panel O-ing seal replacement. | Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal |
|
2290
|
Wednesday, January 12, 2022, 14:09 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#36 | Spent Target Move | The spent UC#36 target in the north
hot cell has been removed and placed in the
spent target vault. See attached PDF for |
|
2294
|
Wednesday, January 19, 2022, 13:26 |
David Wang | Crane | Standard Operation | | | Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames. |
|
2295
|
Wednesday, January 19, 2022, 13:36 |
David Wang | Crane | Standard Operation | | | Targe hall crane below hook attachment pins and plates annual inspection. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates. |
|
2297
|
Thursday, January 20, 2022, 11:09 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#63 | Spent Target Move | The spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and
|
|
2298
|
Monday, January 24, 2022, 11:18 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit hatch functional check | TH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine. |
|
2299
|
Tuesday, January 25, 2022, 08:57 |
David Wang | ITE/ITW | Standard Operation | | | ITE/ITW have been cleaned with vacuum canister. | ITE/ITW are cleaned with vacuum canister.
HV cage inside and blue nylon insulators
are wiped. Garbage inside the pits |
|
2300
|
Tuesday, January 25, 2022, 12:49 |
David Wang | ITE/ITW | Standard Operation | | | Target station vacuum system visual inspection. | Two shielding blocks above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and |
|
2301
|
Wednesday, February 02, 2022, 11:05 |
David Wang | Crane | Standard Operation | | | Target hall overhand crane annual insepection. | Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag |
|
2302
|
Thursday, February 10, 2022, 11:45 |
David Wang | Spent Target Vault | Standard Operation | | UCx#33. | Spent target UCx #33 has been repacked with a new pail and lid in NHC. | Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot |
|
2303
|
Thursday, February 10, 2022, 12:24 |
David Wang | ITW | Standard Operation | | | ITW HV test without mdoule. | Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up |
|
2304
|
Thursday, February 10, 2022, 12:42 |
David Wang | ITE | Standard Operation | | | ITE HV test woithout mdoule was done. | Carla
did the test. That is what she wrote in Feb
04th: "I am done with the HV testing |
|