1318
|
Friday, August 12, 2016, 10:59 |
Anders Mjos | Conditioning Station | Development | TM3 | | HV Test with Service Chase Panel removed | Water cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode. |
|
|
1323
|
Thursday, August 18, 2016, 10:35 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
|
1335
|
Wednesday, August 24, 2016, 14:37 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#33 | PIE | The target was inspected by Anders
and Chad. The target was in good condition
as can be seen on the photos on DocuShare. |
|
|
1336
|
Wednesday, August 24, 2016, 14:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#49 | Conditioning | Wednesday, August 24, 2016, 14:42: RGA
on
Wednesday, August 24, 2016, 20:27: |
|
|
1350
|
Tuesday, September 13, 2016, 13:52 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | | HV Test with new insulators on Service Cap (vacuum to air) | Tuesday, September 12, 2016, 10:00: RGA
on
Tuesday, September 13, 2016, |
|
|
1361
|
Saturday, September 24, 2016, 11:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#34 | Conditioning SiC#34 | Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15:
RGA on for heater conditioning. (kept off |
|
|
1374
|
Thursday, October 20, 2016, 14:17 |
Anders Mjos | ITE | Repair | TM4 | SiC#34 | HV enclosure inspection | The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems |
|
|
1376
|
Friday, October 21, 2016, 15:10 |
Anders Mjos | South Hot-Cell | Repair | TM2 | Ta#49 | Stuck TGHT clamp bolt removal | During target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt |
|
|
1405
|
Thursday, November 24, 2016, 09:33 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#18 | Conditioning UC#18 | Thursday, November 24, 2016, 09:33: Water
package on
Thursday, November 24, 2016, 09:43: |
|
|
1470
|
Wednesday, March 29, 2017, 11:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#19 | Conditioning UC#19 | Wednesday, March 29, 2017, 11:37:
RGA on
Wednesday, March 29, 2017, 13:51: |
|
|
1483
|
Thursday, April 06, 2017, 15:16 |
Anders Mjos | Conditioning Station | Maintenance | | | Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1 | Installation by Marshall. Dave M from controls
adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation |
|
|
1496
|
Thursday, April 13, 2017, 11:44 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#51 | Conditioning Ta#51 | Thursday, April 13, 2017, 11:43:
Water package started. |
|
|
1513
|
Friday, April 28, 2017, 12:04 |
Anders Mjos | Conditioning Station | Maintenance | | | MP1 problem | TCS:MP1 was tripping of intermittently
yesterday. It was found by Dave Morris that
the current sensor was not set correctly |
|
|
1531
|
Wednesday, May 10, 2017, 13:42 |
Anders Mjos | Conditioning Station | Repair | | | Leaky gauge at TCS:TS2 (e-fault: 9609) | Neil Wong will fix this leak tomorrow
Friday. See attached schematics for
location. |
|
|
1532
|
Wednesday, May 10, 2017, 14:00 |
Anders Mjos | South Hot-Cell | Development | | ITE-Ta-LP-FEBIAD | Test target examination | Chad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed. |
|
|
1572
|
Wednesday, June 28, 2017, 16:43 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#52 | Conditioning Ta#52 | NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42: |
|
|
1573
|
Thursday, June 29, 2017, 11:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | UC#20 | Post Irradiation Examination (PIE) | The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater |
|
|
1576
|
Wednesday, July 05, 2017, 11:18 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | Ta#52 | Changed electrical configuration to cathode bias | John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode. |
|
|
1582
|
Wednesday, July 12, 2017, 11:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Testing of new high voltage cable | The target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch |
|
|
1584
|
Monday, July 17, 2017, 16:28 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | 50 kV stable with less than 1 spark/h during
the weekend by RIB obs.
Today 57 kV reached, but observed |
|