Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1106     Entry time: Monday, October 19, 2015, 15:52
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#32 
Subject: Electrical and leak check 

 An electrical check was completed by Travis C and Anders M. Note ~250 kOhm between Target and 60 kV common. Leak check was done by Dan M and Chad F on HS and Window circuits. No leaks found

Attachment 1: ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf  113 kB  | Show | Hide all
ELOG V2.9.2-2455