2213
|
Monday, April 26, 2021, 13:02 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 new steerer cable installation. |
New steerer cables are installed in TM4. Cables are properly routed in containment box and service cap top. After job, TP2 is installed back onto module top. |
|
2214
|
Friday, April 30, 2021, 14:09 |
Luca Egoriti | ITE/ITW | Development | TM4 | | TM4 resistance measurements for P2N |
Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical feedthroughs (A,B,C,D,E,I,P,Q,R,U,60kV,ground) taken with no target or no short attached to the module. Results as expected:
P-Q = 6.439 mOhm
R-U = 6.019 mOhm
All other combinations = Open Loop |
|
2215
|
Monday, May 03, 2021, 15:14 |
Frank Song | ITE | Maintenance | | | High voltage test in ITE |
Anders and I prepared ITE high voltage test in April 30 ( Friday morning), The MAA is locked for this. |
|
2216
|
Friday, May 14, 2021, 11:29 |
David Wang | Spent Target Vault | Standard Operation | | | Repack of 4 spent targets. |
Repack of 4 spent targets in TH and SHC. SiC#37 to new pail249#. SiC#36 to new pail 250#. Nb#8 to new pail 247#, SiC#33 to new pail 248#. They are all in mini storage. Also, UCx 31 are transferred to mini storage. There are 5 spent targets in mini storage now.
2021-05-20: 5 spent targets have been loaded into F308's. We transferred two more spent targets into mini storage this morning for next week loading. |
|
2217
|
Tuesday, May 25, 2021, 15:59 |
Matthew Gareau | North Hot-Cell | Development | | | Removed boot from left hot manipulator |
Myself and Isaac removed the boot from the left hot manipulator.
- opened the hatch in the TH to get access to the top of the boot
- released the latch on the boot and loosened the boot from above
- closed TH hatch
- with the right manipulator we were able to detach the rest of boot
This test proved that we can remove a boot from the manipulator without having to enter into the hotcell.
Due to the physical restraints that the boot causes for the operator, we have decided to not reattach the boot with its current design.
A new design will be investigated to allow the boot to be fixed without twisting, which is the source of the problems.
|
Attachment 1: IMG_20210525_134723.jpg
|
|
Attachment 2: IMG_20210525_134727.jpg
|
|
Attachment 3: MicrosoftTeams-image.png
|
|
Attachment 4: MicrosoftTeams-image_(4)1.png
|
|
Attachment 5: IMG_20210525_141602.jpg
|
|
Attachment 6: IMG_20210525_141851.jpg
|
|
Attachment 7: IMG_20210525_142144.jpg
|
|
|
2218
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance |
A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will contact Plant Group with a quote for repair and upgrades. |
|
2219
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 refilled |
Tank refilled from 12 in to 25 in using the new valve. |
|
2220
|
Monday, May 31, 2021, 11:28 |
David Wang | ITE | Standard Operation | TM4 | | Remotely remove TM4 from silo to shc |
Remotely remove tm4 from silo to shc. The moving is smooth. |
|
2222
|
Thursday, June 03, 2021, 08:20 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Remotely remove TM2 from silo to shc |
Remotely removed Tm2 from silo to SHC. The moving is smooth. |
|
2226
|
Wednesday, June 09, 2021, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 containment box leak check. |
Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line. No leak. |
|
2230
|
Wednesday, June 30, 2021, 14:11 |
Matthew Gareau | North Hot-Cell | Standard Operation | | | North Hot Cell Commemorative Opening |
Yesterday a bottle of Cava (sparkling wine) was place, opened, and poured in the NHC, to commemorate its new operational status.
The NHC is now a functional hot cell and is ready for many years of target exchanges to come. |
|
2231
|
Wednesday, July 07, 2021, 11:59 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual Electrical and Mechanical Inspection |
An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Dan McDonald, and Jason Zhang as per Work Permit I2021-07-07-3. The following items were checked:
- Check condition of wiring for physical/radiation/UV damage
- OK, no signs of significant damage
- Check for cable tray debris or damage
- There were multiple shards of plastic in the cable tray - they were removed and disposed of
- Check inside control panel: components and wiring, labeling
- Labeling intact, components in good condition
- One COM wire for the relay array was loose - it was tightened
- Verify camera views
- This was not inspected but has recently been checked, and is checked prior to remote operation
- Check connectors for damage
- Check pendant for damage and verify labeling intact
- Lid open/close test
- Lid was opened and close multiple times - smooth operation, no concern
- Lid close logic was checked - OK
- Vessel rotation and limit switch check
- Both CW and CCW limits were checked, functioning
- No concern on rotation - chain drive, rotary limit switch, and cable reel all functioning normally
- Lubricate chains
- Inspect tensioners
- Tighten fasteners
- Done - OK
- Note: some concern over socket head screws in slotted parts - they should have washers. Not a critical issue but worth checking into.
- Visual inspection
Overall the inspection was successful. |
Attachment 1: Capture.PNG
|
|
Attachment 2: PXL_20210707_162143876.jpg
|
|
Attachment 3: PXL_20210707_162918257.jpg
|
|
|
2234
|
Thursday, July 15, 2021, 09:02 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test |
The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.
The test was successful. |
|
2235
|
Tuesday, July 20, 2021, 09:46 |
Adam Newsome | ITE | Standard Operation | TM4 | | Remotely moved TM4 from TCS to ITE |
TM4 was moved from the conditioning station to the East target station. |
|
2237
|
Friday, July 30, 2021, 16:31 |
Carla Babcock | ITE | Repair | | | ITE re-wire |
See the attached for the way ITE has been re-wired for the Ta62 run. Note also that the copper block in the schematic on TBHT negative may not actually be connected. Wiring verification on Aug. 4. |
Attachment 1: ISK4425D-rev9._APshortmitigationsvg_july27update.png
|
|
|
2240
|
Tuesday, August 10, 2021, 10:16 |
Adam Newsome | South Hot-Cell | Repair | | | West Entrance Module Move to South Hot Cell |
The West Entrance Module has been moved to the South Hot Cell for repair. |
|
2241
|
Wednesday, August 11, 2021, 11:15 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Cable track for e-chain installed |
A cable track was installed between the mini-storage vault and the silos, for the purpose of implementing a retractable cable chain (e-chain). This will allow for cables to be managed during door opening/closing, so that remote control operation of the door will be possible in the future. See Work Permit I2021-08-11-2 (Aug 11)
Holes were drilled into the motor mounting plate (IRH2089) to allow for mounting a limit switch on the plate. See Work Permit I2021-08-17-7 (Aug 17)
Preliminary testing was completed in which the e-chain was fixed to the door with a C-clamp. Local and remote functionality were checked, and limit switch functionality was verified. Everything is working as expected. A final test will be conducted once the e-chain is fixed to the door and cabling routed through it. See Work Permit I2021-08-19-1 (Aug 19)
The e-chain has not yet been fixed to the vault door - holes will be drilled in-situ after preliminary testing is complete to confirm positioning.
Edit [2021-09-23]: the installation is complete and has been tested. |
Attachment 1: PXL_20210811_165201449.jpg
|
|
|
2242
|
Thursday, August 12, 2021, 14:13 |
Adam Newsome | ITW | Repair | | | West Entrance Module Move to ITW |
The West Entrance Module has been moved from the South Hot Cell to the West Target Station. |
|
2250
|
Thursday, September 23, 2021, 19:04 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Remote Capability |
Remote capability was added for the mini-storage door control. The control signals originate from the Opto 22 Module box that is used for the SMP remote control (this is located just above the storage vault).
The controls signal assignment document has been updated and can be found in C:\PDM Vault\PDM_Vault\_models\isac\isac1\wpn-3919 - safe module parking\Electrical
In order to operate remotely:
- Plug the mini-storage control box power cable into a wall outlet (adjacent main storage vault, under stairs)
- Plug the motor output cable into the mini-storage door motor
- Unplug the local pendant from the box
- Plug the cable that comes from the remote module box into the connector that the pendant was plugged into (M12, 5 pole Murr connector)
- Using the remote control program from the ISAC RH control room, click on the Mini-Storage option and then click buttons for open and close to operate the door (note: it is important to verify both opening and closing functions work before attempting any remote operation).
Remote and local functionality have been tested and verified working.
It is recommended to mount the mini-storage control box in a convenient area near the mini-storage (possibly on the wall adjacent the main storage vault).
Please contact me if you have any further questions. |
|
2256
|
Wednesday, October 06, 2021, 10:42 |
David Wang | ITE | Repair | | | ITE IG1S cable end connector replacement |
ITE IG1S cable end connector replacement has been finished by Roy Huang. |