Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 127 of 138  Not logged in ELOG logo
Entry  Monday, May 31, 2021, 11:28, David Wang, ITE, Standard Operation, TM4, , Remotely remove TM4 from silo to shc 
Entry  Thursday, June 03, 2021, 08:20, David Wang, South Hot-Cell, Standard Operation, TM2, , Remotely remove TM2 from silo to shc 
Entry  Wednesday, June 09, 2021, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 containment box leak check.  
Entry  Wednesday, June 30, 2021, 14:11, Matthew Gareau, North Hot-Cell, Standard Operation, , , North Hot Cell Commemorative Opening 
Entry  Wednesday, July 07, 2021, 11:59, Adam Newsome, Safe Module Parking, Maintenance, , , Annual Electrical and Mechanical Inspection Capture.PNGPXL_20210707_162143876.jpgPXL_20210707_162918257.jpg
Entry  Thursday, July 15, 2021, 09:02, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
Entry  Tuesday, July 20, 2021, 09:46, Adam Newsome, ITE, Standard Operation, TM4, , Remotely moved TM4 from TCS to ITE 
Entry  Friday, July 30, 2021, 16:31, Carla Babcock, ITE, Repair, , , ITE re-wire ISK4425D-rev9._APshortmitigationsvg_july27update.png
Entry  Tuesday, August 10, 2021, 10:16, Adam Newsome, South Hot-Cell, Repair, , , West Entrance Module Move to South Hot Cell 
Entry  Wednesday, August 11, 2021, 11:15, Adam Newsome, Spent Target Vault, Development, , , Mini-Storage: Cable track for e-chain installed PXL_20210811_165201449.jpg
Entry  Thursday, August 12, 2021, 14:13, Adam Newsome, ITW, Repair, , , West Entrance Module Move to ITW 
Entry  Thursday, September 23, 2021, 19:04, Adam Newsome, Spent Target Vault, Development, , , Mini-Storage: Remote Capability 
Entry  Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement 
Entry  Monday, November 15, 2021, 12:15, Adam Newsome, South Hot-Cell, Repair, , , Squeaking noise during turntable rotation - chain misalignment and improper tension PXL_20211119_190640081.jpg
Entry  Friday, November 19, 2021, 12:48, Adam Newsome, South Hot-Cell, Development, , , Vertical motion limit switch installation PXL_20211119_172142852.jpg
Entry  Monday, November 22, 2021, 12:44, Adam Newsome, Crane, Repair, , , Crane PLC Fault: 0004h Fault_code_when_connecting_Nov_22_2021.png
Entry  Tuesday, November 23, 2021, 10:58, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move 
Entry  Wednesday, November 24, 2021, 09:08, Adam Newsome, Conditioning Station, Standard Operation, TM4, , Remotely moved TM4 from SHC to TCS 
Entry  Monday, November 29, 2021, 12:16, David Wang, Spent Target Vault, Standard Operation, , , Five spent targets have been loaded into F308s 
Entry  Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.  
ELOG V2.9.2-2455