ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.ITE water  signal interlock  
check is done.  Everything is good.
It is a annual check we do in winter shut
  
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  2052   Monday, January 27, 2020, 10:40 David WangCoolingMaintenance  ITE/ITW supply water presuure on dump circuits. With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi.  I adjusted ITW dump pressure to
  
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment
 Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf 
  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell EntryChad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using
 NHC_2020-02-27.pdf 
  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up. Using the camera,  Frank and I inspected
the broken  blades in vacuum duct bending
section. We are pretty sure some of 
  
  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without moduleITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control
  
  2078   Friday, March 06, 2020, 09:35 David WangSpent Target VaultStandard Operation SiC #39Spent target SiC#39 removal from SHC to storage vault.Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful.  Note:The small aluminum
  
  2080   Monday, March 09, 2020, 14:31 David WangITE/ITWStandard Operation  TH emergency exit test. Frank and I did the test.  The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. 
  
  2081   Wednesday, March 11, 2020, 10:39 Travis CaveITEMaintenance  Entrance module move The entrance module has been moved
to the east station to the south hot cell
for inspection from the turbo pump explosion.
  
  2082   Thursday, March 12, 2020, 13:42 David WangITE/ITWDevelopment  New ITE IGLIS cables installation New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC
  
  2083   Thursday, March 12, 2020, 13:48 David WangITERepair  Entrance module TP1S broken piesces clean up.The broken pieces in ITE entrance vacuum
pit are vacuumed out.  At SHC, There
are 4 pieces on module collimator block top, 
  
  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move The east entrance module has been
moved from the south hot cell back to the
east target station.
  
  2090   Thursday, March 19, 2020, 15:48 Anders MjosConditioning StationMaintenance  Filter replacement in water system March 5thFilters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5
  
  2091   Friday, March 27, 2020, 08:45 Matthew GareauNorth Hot-CellMaintenance  Issues with the manipulators This is a link to all of the issues
with the NHC manipulators that I know of

  
  2092   Wednesday, May 20, 2020, 13:08 David WangCoolingStandard Operation  Start of HALCW sysytemHigh  active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and
  
  2093   Wednesday, May 20, 2020, 13:19 David WangITEMaintenance  Restart of ITE turbo pumps. PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up
  
  2094   Wednesday, May 20, 2020, 13:30 David WangSafe Module ParkingMaintenance  Silo area radio active waste clean up. Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past.
  
  2095   Friday, May 22, 2020, 13:26 David WangITWRepair  ITW water leak.A water leak was found on a fitting connecting
ITW dump return line pressure gauge on top
of exit module. TM tank flange, o-ring slot
 itw_water_leak_001.JPGitw_water_leak_005.JPGitw_water_leak_009.JPGitw_water_leak_013.JPG 