Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2081     Entry time: Wednesday, March 11, 2020, 10:39
Author: Travis Cave 
Category: ITE 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Entrance module move 

 The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion.

ELOG V2.9.2-2455