2046
|
Friday, January 10, 2020, 10:26 |
David Wang | ITE | Standard Operation | | | ITE water signal inerlock check. | ITE water signal interlock
check is done. Everything is good.
It is a annual check we do in winter shut |
|
2047
|
Monday, January 13, 2020, 14:19 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 and Ta#52 | spent target repackaging and moved to mini vault. | Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed |
|
2052
|
Monday, January 27, 2020, 10:40 |
David Wang | Cooling | Maintenance | | | ITE/ITW supply water presuure on dump circuits. | With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi. I adjusted ITW dump pressure to |
|
2063
|
Thursday, February 06, 2020, 13:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#29 | UC#29 moved to vault location 6A, in pail 225 | UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. |
|
2069
|
Thursday, February 20, 2020, 09:27 |
David Wang | Spent Target Vault | Standard Operation | | | Inventory of mini storage and vault. | Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment |
 |
2073
|
Thursday, February 27, 2020, 16:08 |
Anders Mjos | North Hot-Cell | Maintenance | | | Hot Cell Entry | Chad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using |
|
2074
|
Friday, February 28, 2020, 09:36 |
David Wang | ITE | Repair | | | Entrance module TP1S broken piesces clean up. | Using the camera, Frank and I inspected
the broken blades in vacuum duct bending
section. We are pretty sure some of |
|
2075
|
Wednesday, March 04, 2020, 11:52 |
David Wang | ITE | Standard Operation | | | ITE HV test without module | ITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control |
|
2078
|
Friday, March 06, 2020, 09:35 |
David Wang | Spent Target Vault | Standard Operation | | SiC #39 | Spent target SiC#39 removal from SHC to storage vault. | Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful. Note:The small aluminum |
|
2080
|
Monday, March 09, 2020, 14:31 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit test. | Frank and I did the test. The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. |
|
2081
|
Wednesday, March 11, 2020, 10:39 |
Travis Cave | ITE | Maintenance | | | Entrance module move | The entrance module has been moved
to the east station to the south hot cell
for inspection from the turbo pump explosion. |
|
2082
|
Thursday, March 12, 2020, 13:42 |
David Wang | ITE/ITW | Development | | | New ITE IGLIS cables installation | New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC |
|
2083
|
Thursday, March 12, 2020, 13:48 |
David Wang | ITE | Repair | | | Entrance module TP1S broken piesces clean up. | The broken pieces in ITE entrance vacuum
pit are vacuumed out. At SHC, There
are 4 pieces on module collimator block top, |
|
2084
|
Friday, March 13, 2020, 09:24 |
Travis Cave | ITE | Standard Operation | | | Entrance module move | The east entrance module has been
moved from the south hot cell back to the
east target station. |
|
2090
|
Thursday, March 19, 2020, 15:48 |
Anders Mjos | Conditioning Station | Maintenance | | | Filter replacement in water system March 5th | Filters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5 |
|
2091
|
Friday, March 27, 2020, 08:45 |
Matthew Gareau | North Hot-Cell | Maintenance | | | Issues with the manipulators | This is a link to all of the issues
with the NHC manipulators that I know of
|
|
2092
|
Wednesday, May 20, 2020, 13:08 |
David Wang | Cooling | Standard Operation | | | Start of HALCW sysytem | High active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and |
|
2093
|
Wednesday, May 20, 2020, 13:19 |
David Wang | ITE | Maintenance | | | Restart of ITE turbo pumps. | PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up |
|
2094
|
Wednesday, May 20, 2020, 13:30 |
David Wang | Safe Module Parking | Maintenance | | | Silo area radio active waste clean up. | Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past. |
|
2095
|
Friday, May 22, 2020, 13:26 |
David Wang | ITW | Repair | | | ITW water leak. | A water leak was found on a fitting connecting
ITW dump return line pressure gauge on top
of exit module. TM tank flange, o-ring slot |
   |