ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken | The target was inspected today.
It was found that the target tube
had broken on both sides of the centre block |
|
421
|
Thursday, August 15, 2013, 16:35 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak found on Coil 1 | By
pressurizing the water lines with 70 psi |
|
422
|
Monday, August 19, 2013, 10:08 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak Check | All water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible |
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
517
|
Tuesday, October 22, 2013, 14:23 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | as measured today in the electrical room
by David and Anders |
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
529
|
Friday, October 25, 2013, 13:39 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders.
|
|
532
|
Thursday, October 31, 2013, 11:38 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders. |
|
554
|
Thursday, November 21, 2013, 12:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | NiO#2 | End of beam target inspection - ANODE does not hold 250V | The target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found |
|
588
|
Wednesday, January 22, 2014, 15:20 |
Anders Mjos | South Hot-Cell | Standard Operation | | UC#8 | Target Inspection - post beam | The Target Assembly was inspected with
Chad, Jens Henning and Anders today.
The Target Container was |
|
639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
687
|
Tuesday, June 24, 2014, 15:14 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal | When the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to |
|
688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run | See attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode. |
|
689
|
Wednesday, June 25, 2014, 12:49 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal |
|
|
690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box | See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare. |
|
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
|
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|