  538   Tuesday, November 12, 2013, 10:59 Bevan MossSouth Hot-CellStandard OperationTM2 Electrical Test

 Don Jackson and Myself completed started an electrical test on TM2. All lines passed the with OL to ground. When testing in between the lines individually there were several lines that read other than OL. It was decided to abandon the testing as there were too many "failures". The results are attached. The testing will be repeated in the conditioning station with vacuum. It is not expected that this will change anything as during a quick visual inspection it appears the lines are touching. Of note the water block jig was removed this morning by Chad.

Attachment 1: tm2_elec_test.pdf
tm2_elec_test.pdf
  1900   Tuesday, March 26, 2019, 11:17 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Checks of TM#2 during the source tray change.

 The four electrical check done on TM#2 during the source tray change.

Attachment 1: Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf
Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf
Attachment 2: Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf
Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf
Attachment 3: Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf
Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf
Attachment 4: Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf
  1360   Friday, September 23, 2016, 08:55 Travis CaveConditioning StationStandard OperationTM4SiC#34Electrical Checks

The bundle of electrical checks, first one is the Iglis that failed, the second is the everything passed at the hot cell and the third is a the conditioning station under vacuum.

Attachment 1: TM4_elechk_SiC34_SHC.PDF
TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Checks

Results of the electrical check of TM#2 with no target after the repair and with the SiC#35 mounted on the module.

Attachment 1: TM2_elechk_notgt_SHC_repair.PDF
TM2_elechk_notgt_SHC_repair.PDF
Attachment 2: TM2_elechk_SiC35_SHC.PDF
TM2_elechk_SiC35_SHC.PDF
  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cell

Megger checks were exceptionally high (good).  Readings taken less than 2 hours after reading low values from end of run on Nb#6.  Tests on Ta38 will be repeated at conditioning station later.

Attachment 1: Ta38_New_Target.JPG
Ta38_New_Target.JPG
  1517   Monday, May 01, 2017, 13:11 David WangSouth Hot-CellRepairTM3 Electrical Check on TM3 after fibergalss is moved in SHC.

RU( coil 1), F (anode), and 60kv bias(HS, Gasline, and MSP)  are shorted together. Other lines are good.  They are measured between  individual line each other  @500V. The megga showed OL. All of  them to ground are OL @500V as well. EL is grounded during check.

  1597   Tuesday, August 15, 2017, 09:27 Anders MjosSouth Hot-CellStandard OperationTM2SiC#36Electrical Check of target in SHC

Travis Cave wrote:

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

by David and Chad after target removed from module:

Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm.

  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC

 An electrical check made at NHC right after TM4 moving from ITE.

Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
  1484   Friday, April 07, 2017, 09:53 Travis CaveConditioning StationMaintenanceTM1no targetElectrical Check and TM1 other checks

Results of an electrical check on TM#1 with no target attached to it.

 I use this e-log entry for TM1 notes as well  1. TM1 IG1 is a dual filament gauge . Its filament is very close to grid now. It shorted one time during the pumping down. It still works fine so far . But, we may need to change it if we use this module in TS again.

TCS 1G1 and 1G1S are pumped to 5Xe-6 torr. IG2 stayed at 2.5XE-5 torr. Since no target is installed on module , I capped top of HS water line. Maybe, the small o-ring seal in cap is too old, I found a big leak on this seal when i use LD check it. That is the reason IG2 stayed too high. Still, Leak check and helium presuure test are fulfilled on TM1. Leak detector BLR 5XE-7 atm.cc/sec, BP 0.0XE-4 torr9.  Back up pressure is 51 mtorr which is high because of leak on HS line cap seal so LD BLR is high. At this level, Ta+-, Tube +-, MSP,  EE are good.  Other air to vacuum seal are good as well at this leak rate.  I will check and change small o-ring seal in HS cap. The TM1 is functional basically.

Attachment 1: TM1_elec_chk_no_tgt.PDF
TM1_elec_chk_no_tgt.PDF
  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of run

Megger check values were low but still within operational range.

Attachment 1: Nb#6_End_of_Run.JPG
Nb#6_End_of_Run.JPG
  1004   Tuesday, July 21, 2015, 09:21 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check Failed

TM#2 has failed the electrical check see attached pdf for details.

Attachment 1: TM#2_elec_chk_source_tray_no_tgt.PDF
TM#2_elec_chk_source_tray_no_tgt.PDF
  922   Monday, June 01, 2015, 14:24 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical Check

Post beam electrical check on the Ta#45 target installed on TM#4. See attached PDF.

Attachment 1: TM4_Ta45_elecchk_postbeam.PDF
TM4_Ta45_elecchk_postbeam.PDF
  925   Tuesday, June 02, 2015, 10:39 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical Check

Electrical check on TM#4 with SiC#31. See attached PDF for details.

Attachment 1: TM4_SiC31_elecchk_SHC.PDF
TM4_SiC31_elecchk_SHC.PDF
  1008   Wednesday, July 22, 2015, 11:31 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Electrical check done on TM#2 around the 25th of June 2015, this was before the coil line leak was found.

Attachment 1: TM#2elecchksourcetraynotgt62515.PDF
TM#2elecchksourcetraynotgt62515.PDF
  1013   Monday, July 27, 2015, 12:12 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical Check

Electrical check of TM#4 post beam with target (SiC#31) on and module without target on. There is a short between the target and EE when the target is on and when the target was removed short went away. See the PDF for details.

Attachment 1: TM4_elecchk_notgt.PDF
TM4_elecchk_notgt.PDF
Attachment 2: TM4SiC31postbeamelecchk_.PDF
TM4SiC31postbeamelecchk_.PDF
  1014   Monday, July 27, 2015, 13:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical Check

Electrical check of TM#4 with UC#13 at the south hot cell. See PDF for details.

Attachment 1: TM4UC13IGLISelecchkSHC.PDF
TM4UC13IGLISelecchkSHC.PDF TM4UC13IGLISelecchkSHC.PDF
  1021   Tuesday, July 28, 2015, 14:31 Travis CaveConditioning StationStandard OperationTM4UC#13Electrical Check

TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF.

Attachment 1: TM4UC13IGLISelecchkCS.PDF
TM4UC13IGLISelecchkCS.PDF TM4UC13IGLISelecchkCS.PDF
  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical Check

Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed.

Attachment 1: TM2_elechknotgtafterwidget.PDF
TM2_elechknotgtafterwidget.PDF
Attachment 2: TM2_elechknotgtshunt.PDF
TM2_elechknotgtshunt.PDF
Attachment 3: TM2_elecchkdummytgt.PDF
TM2_elecchkdummytgt.PDF
  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check

TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented.

Attachment 1: TM2_elecchkdummytgtatCS.PDF
TM2_elecchkdummytgtatCS.PDF
  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical Check

Electrical check of TM#2 with ZrC #7 installed

Attachment 1: TM2_elec_chk_ZrC7_SHC.PDF
TM2_elec_chk_ZrC7_SHC.PDF