Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1900     Entry time: Tuesday, March 26, 2019, 11:17
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: no target 
Subject: Electrical Checks of TM#2 during the source tray change. 

 The four electrical check done on TM#2 during the source tray change.

Attachment 1: Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdf  179 kB  | Show | Hide all
Attachment 2: Electrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdf  175 kB  | Show | Hide all
Attachment 3: Electrical_Check_TM#_New_source_Tray_Mar_22_2019.pdf  197 kB  | Show | Hide all
Attachment 4: Electrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf  181 kB  | Show | Hide all
ELOG V2.9.2-2455