Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1013     Entry time: Monday, July 27, 2015, 12:12
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC#31 
Subject: Electrical Check 

Electrical check of TM#4 post beam with target (SiC#31) on and module without target on. There is a short between the target and EE when the target is on and when the target was removed short went away. See the PDF for details.

Attachment 1: TM4_elecchk_notgt.PDF  154 kB  | Show | Hide all
Attachment 2: TM4SiC31postbeamelecchk_.PDF  156 kB  | Show | Hide all
ELOG V2.9.2-2455