438
|
Thursday, August 29, 2013, 17:16 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair | Today Chad entered the south hot
cell on work permit 2013-08-29-3 to repair
the leaking heat shield line. The heat shield |
|
439
|
Friday, August 30, 2013, 10:27 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
440
|
Friday, August 30, 2013, 14:55 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
441
|
Wednesday, September 04, 2013, 12:21 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Ante-room work | September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and |
|
444
|
Friday, September 06, 2013, 16:41 |
Bevan Moss | South Hot-Cell | Development | TM3 | | C-Seal crush investigation | Today Maico completed the new leak
testing tool and blank off. He tested them
with C-seals without springs and all was |
6x |
450
|
Wednesday, September 11, 2013, 15:37 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | C-Seal leak checking and repair | This e-log is to cover the work completed
from September 9th until the 11th.
September 9th |
|
455
|
Tuesday, September 17, 2013, 14:36 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Containment Box has been removed | The containment box has been removed.
Tomorrow the wiring harness will be installed. |
|
458
|
Thursday, September 19, 2013, 15:56 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities for September 18th and 19th | September 18th
The wiring harness was completed
by Maico and Travis today (see pics) and |
    |
460
|
Monday, September 23, 2013, 16:10 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities Sept 20 - 23 2013 | September 20th
Today was a trying day. When attempting
to make the water line connections for the |
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|
468
|
Thursday, September 26, 2013, 14:31 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 | September 24
After the manipulator repair
Maico installed the NiO#2 onto the target |
|
469
|
Thursday, September 26, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Leak check / Pressure Test |
|
|
470
|
Thursday, September 26, 2013, 14:42 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 |
|
|
471
|
Thursday, September 26, 2013, 14:47 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | NiO#2 | Water pumps turned on | The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station |
|
472
|
Thursday, September 26, 2013, 14:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning | The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has |
|
473
|
Thursday, September 26, 2013, 15:00 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | RGA not connecting | Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan |
|
474
|
Thursday, September 26, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning |
|
|
476
|
Friday, September 27, 2013, 12:53 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP TGHT and TBHT conditioning | Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical |
 |
479
|
Monday, September 30, 2013, 15:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Module move from SW Silo to SHC | TM4 was move by myself and Grant.
Move went smoothly, no hang ups. |
|
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
|
|