  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC An electrical check made at NHC right
after TM4 moving from ITE.
 tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg 
  1484   Friday, April 07, 2017, 09:53 Travis CaveConditioning StationMaintenanceTM1no targetElectrical Check and TM1 other checksResults of an electrical check on TM#1
with no target attached to it.
 I use this e-log entry for
 TM1_elec_chk_no_tgt.PDF 
  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of runMegger check values were low but still
within operational range.
 Nb#6_End_of_Run.JPG 
  1004   Tuesday, July 21, 2015, 09:21 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check FailedTM#2 has failed the electrical check see
attached pdf for details.
 TM#2_elec_chk_source_tray_no_tgt.PDF 
  922   Monday, June 01, 2015, 14:24 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical CheckPost beam electrical check on the Ta#45
target installed on TM#4. See attached PDF.
 TM4_Ta45_elecchk_postbeam.PDF 
  925   Tuesday, June 02, 2015, 10:39 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical CheckElectrical check on TM#4 with SiC#31. See
attached PDF for details.
 TM4_SiC31_elecchk_SHC.PDF 
  1008   Wednesday, July 22, 2015, 11:31 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckElectrical check done on TM#2 around the
25th of June 2015, this was before the coil
line leak was found.
 TM#2elecchksourcetraynotgt62515.PDF 
  1013   Monday, July 27, 2015, 12:12 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical CheckElectrical check of TM#4 post beam with
target (SiC#31) on and module without target
on. There is a short between the target and
 TM4_elecchk_notgt.PDFTM4SiC31postbeamelecchk_.PDF 
  1014   Monday, July 27, 2015, 13:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical CheckElectrical check of TM#4 with UC#13 at
the south hot cell. See PDF for details.
 TM4UC13IGLISelecchkSHC.PDF 
  1021   Tuesday, July 28, 2015, 14:31 Travis CaveConditioning StationStandard OperationTM4UC#13Electrical CheckTM#4 with UC#13 electrical check at the
conditioning station under vacuum. See attached
PDF.
 TM4UC13IGLISelecchkCS.PDF 
  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical CheckElectrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check
 TM2_elechknotgtafterwidget.PDFTM2_elechknotgtshunt.PDFTM2_elecchkdummytgt.PDF 
  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical CheckTM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented.
 TM2_elecchkdummytgtatCS.PDF 
  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 with ZrC #7 installed  TM2_elec_chk_ZrC7_SHC.PDF 
  1054   Thursday, August 27, 2015, 08:43 Travis CaveConditioning StationStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower
 TM2_elec_chk_ZrC7_CS.PDF 
  1073   Tuesday, September 22, 2015, 11:35 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical CheckTM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on.
 TM4elecchkUC13postbeamSHC.PDFTM4_elecchk_totgt_with_IGLISline.PDF 
  1074   Tuesday, September 22, 2015, 11:39 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check with Ta#46 attached.  TM4Ta46elecchkSHC.PDF 
  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check at the conditioning
station with Ta#46 target.
 TM4Ta46elecchkCS.PDF 
  1088   Wednesday, September 30, 2015, 11:14 Travis CaveSouth Hot-CellRepairTM3no targetElectrical CheckTM#3 electrical check at the south hot
cell, no target, all value are done at 1000Volts.
See the attached PDF for the results.
 TM3_elecchk_notgt_shc.PDF 
  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical CheckElectrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs.
 TM2_SiC32_postbeam.PDFTM2_elec_chk_notgt_CS.PDF 
  1184   Wednesday, March 30, 2016, 11:00 Travis CaveConditioning StationStandard OperationTM1no targetElectrical CheckThe results of the TM#1 electrical check
from the 29th of March 2016
 TM1_elec_chk_notgt.PDF 