Entry  Tuesday, July 23, 2013, 13:33, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#40, Electrical check TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF

Results of electrical check on Ta#40 target on TM#4 post beam at the south hot cell

Entry  Wednesday, July 24, 2013, 08:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF

Electrical check on TM#4 with SiC#29 has been done. The reading of the magnet coil and 60kV common is low at 750 ohms, normally this infinite. Awaiting further instruction on if this is a pass or fail. See attached PDF for the rest of the details.

Entry  Thursday, July 25, 2013, 09:37, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#29, Electrical check TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF

Electrical check of TM#4 with SiC#29 attached. Results are pretty much the same as yesterday for the coil to 60kV common, and anode to 60kV common. See attached pdf for details.

Entry  Tuesday, August 27, 2013, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, Electrical check TM#1_UC#7__TgtElecChk_SHC_.PDF

TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.

Entry  Thursday, September 12, 2013, 10:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check TM#4SiC#29FEBIADelechkpostbeam.PDF

TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details.

Entry  Thursday, September 19, 2013, 11:09, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Electrical check 

Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short between the coils and a 165M Ohm short between the coil and 60kV common.  All other circuits passed they were infinite in value.

Entry  Tuesday, September 24, 2013, 08:15, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_chk_no_target.PDF

Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.

Entry  Wednesday, September 25, 2013, 11:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_SHC.PDF

The module was checked electrically this morning before the module move. See the attached PDF for details.

Entry  Wednesday, September 25, 2013, 13:48, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_CS.PDF

Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details.

Entry  Monday, September 30, 2013, 12:23, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_SHC2.PDF

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

    Reply  Monday, September 30, 2013, 16:00, Bevan Moss, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check 

Travis Cave wrote:

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

 There was also a leak check. There was some water remaining in the HS line but once removed the leak cart pumped down to 0.0 x 10-4 Torr and the leak tester was at the bottom limit. There was no response when sprayed with helium

Entry  Tuesday, October 01, 2013, 10:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check TM#4_elec_chk_SiC#29_SHC_post2.PDF

TM#4 with SiC#29 electrical check post beam see pdf for details.

Entry  Tuesday, October 01, 2013, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_CS2.PDF

TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details.

Entry  Wednesday, October 02, 2013, 14:47, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical check TM#4_elec_chk_No_Tgt_SHC.PDF

Electrical check done on TM#4 with no target, see PDF.

Entry  Friday, October 18, 2013, 14:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical check TM#4_no_target_post_coilelectest.PDF

With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf.

Entry  Wednesday, December 04, 2013, 14:09, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#41, Electrical check TM#4_Ta41_electest_SHC_PostBeam.PDF

Electrical check of TM#4 with Ta#41 post beam at the south hot cell. See PDF for details

Entry  Thursday, December 05, 2013, 12:51, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#8 and no target, Electrical check TM#4_UC8_electest_SHC.PDFTM#4_notarget_electest_SHC.PDF

Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results.

Entry  Tuesday, March 25, 2014, 13:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF

TM#4 was checked electrically with and without target on it, see attached PDFs for details.

Entry  Thursday, March 27, 2014, 10:47, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#42, Electrical check TM#4_Ta42surf_electest_CS.PDF

TM#4 with Ta#42 in the conditioning station under vacuum electrical check.

Entry  Monday, April 07, 2014, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_test_no_target.PDF

TM#3 electrical check at the south hot  cell with no target to give us a base line and show that things are ok with the module for the start of the running year.