388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved |
Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
387
|
Wednesday, June 26, 2013, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 UCx target heat shield |
Chad and I leak checked the TM1 UCx target heat shield at SHC. No leak has been found so far. |
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started |
The roughing pumps have been started on the conditioning station. As it is late in the day for David he will make the turbo pump connections tomorrow. |
385
|
Tuesday, June 25, 2013, 14:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move |
Module moves of TM#1 with Ta#39 from ITW to SHC then TM#1 with UCx#6 from SHC to the conditioning station moves went well. |
384
|
Tuesday, June 25, 2013, 13:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | Electrical check |
Results from the electrical check of TM#1 with the UC#6 target. See attached PDF. |
Attachment 1: TM#1_UC#6_SIS_Target_Elec_Chk.PDF
|
|
383
|
Friday, June 21, 2013, 09:26 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up Leak Check Results |
The Mock-up has been leak tested after the remote connection of the water blocks and is leak tight!
Thanks everybody who contributed to its success. |
382
|
Thursday, June 20, 2013, 13:47 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay |
Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage vault. |
Attachment 1: Vault_Storage_June_20_2013.pdf
|
|
381
|
Wednesday, June 19, 2013, 08:15 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock up water block connections |
All water block connections on the mock-up have bben achieved. It is now ready for leak checking.
The front half of the water block jig proved extremely difficult to remove. |
Attachment 1: 20130619_080806[1].jpg
|
|
Attachment 2: 20130619_080808[1].jpg
|
|
380
|
Tuesday, June 18, 2013, 14:00 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up testing / water block connections |
The testing of the mock-up and tooling has commenced.
Source tray mock-up has been driven into the mock-up and the first two water block connections have been made; the first with the torque limiting
T-handle tool and the second with the torque limiting air rachet attachment. Both seem to work well, although achieving the required torque with the manipulators proved to be near the limit of the manipulator.
|
379
|
Thursday, June 13, 2013, 09:21 |
chad fisher | South Hot-Cell | Development | | | Warm Cell Mock-up |
the warm cell mock-up has been inserted into the warm cell and final preparation for the remote test are being made. |
Attachment 1: 20130613_084421[1].jpg
|
|
Attachment 2: 20130613_084426[1].jpg
|
|
378
|
Thursday, June 13, 2013, 09:18 |
chad fisher | South Hot-Cell | Repair | TM3 | | Source Tray/Extraction Column Removal |
TM3 Rev 2 source tray/extraction column insertion into its storage was completed yesterday and it was then removed from the hot cell and put into the anteroom until June 25th when it will be moved into the vault tunnel.
The Box did have 10000 counts of contamination "all over" it. It has recieved inital decontamination and is down to 1000 counts.
|
377
|
Wednesday, June 12, 2013, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | | | spent source tray removal |
The spent source tray for TM#3 has been removed from the south hot cell and well be placed in the the hot cell ante room. To sit till maintenance day to be moved over to the vault storage tunnels. |
376
|
Tuesday, June 11, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. |
Dan and I disconnected TM1 in ITW. |
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced |
ESC was called out again to inspect the chiller as it was showing the same problem as before. This time when started one fan came on (this is not what happened last time) but the fan controlled by the VFD did not. It was eventually traced to a relay that has been replaced. The system was tested as best it could without a load and appears to be working. It will be difficult to tell until a heat load is in place if the fix has solved everything. |
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE |
Dan an I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam. |
373
|
Friday, May 31, 2013, 11:19 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#28 (RFQ Target) | Spent target move |
Spent target SiC#28 (RFQ Target) has been moved from the south hot to the storage vault. The target was placed in pail #105 in spot 2C of the spent target vault. The target had a field of 24.8mSv/hr at about a meter upon removal from the south hot cell. See attached PDF for the status of the vault. It currently only has six free spots left. |
Attachment 1: Vault_Storage_May_31_2013.pdf
|
|
372
|
Wednesday, May 29, 2013, 12:07 |
chad fisher | South Hot-Cell | Development | | SiC#28 RFQ | RFQ Autopsy |
Major portions of the RFQ target have now been sucessfully dismantled. More minor dismantling with conclude this afternoon. |
371
|
Wednesday, May 29, 2013, 06:32 |
David Wang | ITE | Standard Operation | TM4 | Ta#40 | TM4 has been connected in ITE. |
TM4 has been connected in ITE. The pumping down is fine so far.TM4 water interlock check was done yesterday. |
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check |
Results of the electrical check on TM#4 with Ta#40, it passed. See attached PDF for results. |
Attachment 1: TM#4_Ta#40_SIS_Target_Elec_Chk.PDF
|
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move |
TM#4 with Ta #40 moved from the conditioning station to the east target station, move went well. |