  211   Friday, November 09, 2012, 09:20 Travis CaveConditioning StationStandard OperationTM1TiC#3Electrical checkElectrical check performed on TM#1 with
TiC#3 at the conditioning station under vacuum.
See PDF for details.
 TM_1_TiC_3_Elec_check_CS_Vac.PDF 
  227   Tuesday, January 08, 2013, 08:48 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC #3 post beam. See attached
PDF for results.
 TiC#3_Elec_Check_Post_beam.PDF 
  228   Tuesday, January 08, 2013, 14:18 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkTM#1 was electrically check with out a
target see attached PDF for results.
 TM#1_no_tgt_Jan_8_2013.PDF 
  235   Friday, January 18, 2013, 09:10 Travis CaveSouth Hot-CellStandard OperationTM4CS Test Target #1Electrical checkElectrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details.
 CS_Test_Target_#1_Elec_check.PDF 
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical checkElectrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details.
 TM1_Ta39_SHC_ELEC_CHK.PDF 
  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for
 TM1_Ta39_CS_ELEC_CHK.PDF 
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and
 TM1_Ta39_CS_ELEC_CHK2.PDF 
  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been
 TM1_Ta39_CS_ELEC_CHK3.PDFTM1_Ta39_CS_ELEC_CHK4.PDFTM1_Ta39_CS_ELEC_CHK5.PDF 
  301   Wednesday, April 17, 2013, 09:26 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkElectrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts
 TM3_DLB_9_PIN_CONN_ID_and_CHK.PDFTM3_Elec_CHK_no_target.PDF 
  338   Friday, May 10, 2013, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check with no target and
no source tray, see pdf.
 TM#3_elec_chk_no_tgt_no_tray.PDF 
  370   Tuesday, May 28, 2013, 10:42 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of the electrical check on 
TM#4 with Ta#40, it passed. See attached
PDF for results.
 TM#4_Ta#40_SIS_Target_Elec_Chk.PDF 
  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical checkResults from the electrical check of TM#1
with the UC#6 target. See attached PDF.
 TM#1_UC#6_SIS_Target_Elec_Chk.PDF 
  406   Tuesday, July 23, 2013, 13:33 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of electrical check on Ta#40 target
on TM#4 post beam at the south hot cell
 TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF 
  407   Wednesday, July 24, 2013, 08:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkElectrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally
 TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF 
  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical checkElectrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to
 TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF 
  429   Tuesday, August 27, 2013, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#7Electrical checkTM#1 with UCx#7 electrical check, numbers
look good, see PDF for details.
 TM#1_UC#7__TgtElecChk_SHC_.PDF 
  452   Thursday, September 12, 2013, 10:35 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details.
 TM#4SiC#29FEBIADelechkpostbeam.PDF 
  457   Thursday, September 19, 2013, 11:09 Travis CaveSouth Hot-CellMaintenanceTM3no targetElectrical checkElectrical check of TM#3 with no target
was performed and it failed.
  
  461   Tuesday, September 24, 2013, 08:15 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkElectrical check was done on TM#3 yesterday
and again the coil lines to the 60kV common
and the coil line to each other failed, as
 TM#3_elec_chk_no_target.PDF 