  1560   Thursday, June 15, 2017, 11:29 Isaac EarleNorth Hot-CellDevelopment  NHC inlet ducting installedThe North Hot Cell inlet ducting assembly
was installed today in the target hall at
the north end of the NHC roof block.  A
 IMG_0217.jpgIMG_0218.jpgIMG_0219.jpgIMG_0214.jpg 
  1562   Thursday, June 22, 2017, 11:10 chad fisherSouth Hot-CellMaintenance  In cell airlineThe in cell airline has preemptively been
replaced. The hose was, as far as I know
the original.
  
  1563   Friday, June 23, 2017, 12:08 David WangCraneRepair  TH crane inspection and probem fixing by Gordon crane Gordon crane technician Peter came in today
and checked TH crane. Maico  and I were there
with him. What he found is that brake gap
  
  1564   Friday, June 23, 2017, 17:28 Isaac EarleNorth Hot-CellDevelopment  NHC module flange and cameras installed The North Hot Cell module support
flange (IRH1152D) was installed on June 21,
2017 using 1/8" rubber sheet as a sealing
 IMG_0231.jpgIMG_0234.jpgIMG_0240.jpgIMG_0245.jpgIMG_0240.jpg 
  1574   Thursday, June 29, 2017, 11:55 David WangConditioning StationRepair  TCS HV cable and feed through installationJohn Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269
  
  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in
 Vault_Storage_June_29_2017.pdf 
  1577   Wednesday, July 05, 2017, 15:36 Isaac EarleNorth Hot-CellDevelopment  NHC and SHC nuclear ventilation flow sensors installed Installation of new flow sensors
and transmitters for the NHC and SHC duct
lines was completed in the target hall today.
 IMG_0264.JPGIMG_0265.JPG 
  1578   Thursday, July 06, 2017, 14:23 Isaac EarleNorth Hot-CellRepair  Slave side Z motion tape snapped on NHC right side manipulatorThe NHC right side manipulator was evaluated
today to check if operation was normal through
all ranges of motion.  The manipulator
  
  1579   Monday, July 10, 2017, 09:09 Dan McDonaldNorth Hot-CellRepair  manipulator cart repairA  hydraulic leak was found on the
manipulator  install and repair cart,
upon further investigation the cause was
 IMG_2955.JPG 
  1582   Wednesday, July 12, 2017, 11:05 Anders MjosConditioning StationMaintenance  Testing of new high voltage cableThe target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch
 2017-07-12_HV_Cable_Test.xlsx 
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  
  1592   Wednesday, August 02, 2017, 15:41 Keith C NgAssembly/Bench TestDevelopment  spare source tray buildAfter re zeroing alignment telescope to
master jig and adjusted parts into place:
 
 20170802_sourcetray_RHB_8264.JPG20170802_sourcetray_RHB_8266.JPG 
  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move The spent SiC#36 has been moved from
the south hot cell to the spent target vault.
 Vault_Storage_August_3_2017.pdf 
  1596   Wednesday, August 09, 2017, 16:39 Isaac EarleNorth Hot-CellDevelopment  NHC drain line into sump identified The NHC drain line was tested by
pouring approximately 10 gallons of water
through the drain grate at the base of the
  
  1599   Tuesday, August 15, 2017, 12:10 Isaac EarleNorth Hot-CellDevelopment  ISAC Active Sump low water level measuredThe ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2
  
  1600   Thursday, August 17, 2017, 14:38 Isaac EarleNorth Hot-CellDevelopment  4/6 NHC roof blocks installed Roof blocks IRH1641, IRH1642, IRH1643,
and IRH1644 have been fully assembled, labeled,
and installed as per drawing IRH1652.  Fabrication
 7x 
  1601   Friday, August 25, 2017, 16:33 Anders MjosConditioning StationRepair  Testing HV after cooling line repair The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed.
 2017-08-25_HV_Water_Line_Test.xlsx 
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target moveThe spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details.
 Vault_Storage_August_30_2017.pdf 
  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator MaintenenceEntered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed.
  
  1630   Thursday, September 28, 2017, 11:59 Travis CaveSpent Target VaultStandard Operation Ta#53Spent Target moveThe spent Ta#53 has been moved to the spent
target vault. See attached file for details.
 Vault_Storage_September_28_2017.pdf 