Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1548     Entry time: Tuesday, May 23, 2017, 14:10
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITE water interlock check is done. 

We do this check once a year now. Rene found a target oven reset issue during the check . He will consult with Friedhelm. The interlock check is good.

ELOG V2.9.2-2455