Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1558     Entry time: Tuesday, June 13, 2017, 11:10
Author: Grant Minor 
Category: Crane 
Type: Maintenance 
Module:  
Target/Number:  
Subject: ISAC THall Crane 100% / 125% Load Test Documentation - 2011 

The ISAC Target Hall Crane was load tested and re-certified in January 2011 prior to doing a near-capacity lift for the North Hot Cell roof structure (IRH1112E).

Photos and documentation from Norelco is attached.

- Grant

Attachment 1: ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdf  85 kB  | Show | Hide all
Attachment 2: IMG_8722.JPG  2.140 MB  | Show | Hide all
Attachment 3: IMG_8752.JPG  1.946 MB  | Show | Hide all
Attachment 4: IMG_8735.JPG  1.995 MB  | Show | Hide all
Attachment 5: IMG_8745.JPG  2.096 MB  | Show | Hide all
ELOG V2.9.2-2455