1443
|
Thursday, March 02, 2017, 15:02 |
Isaac Earle | North Hot-Cell | Development | | | NHC roughing filter installed | The roughing filter assembly (RFM0001D)
has been installed at the ventilation exhaust
hole on the NHC partition wall. The |
|
|
1444
|
Monday, March 06, 2017, 08:01 |
David Wang | Cooling | Repair | | | HALCW resin tank replacement. | HALCW resin tank has been replaced. The
old tank is stored in middle-west silo now.
The field on old resin tank bottom is about |
11x |
|
1445
|
Tuesday, March 07, 2017, 09:25 |
David Wang | ITW | Repair | | | ITW HALCW 2" return line ball valve seals replacement. | Leaking seals on ITW HALCW 2" return
line ball valve have been replaced. 8 liter
waters are drained out for this job. Water |
|
|
1446
|
Tuesday, March 07, 2017, 14:41 |
David Wang | ITE | Maintenance | | | ITE dump plug water circuit is closed for ITE IG1S small surge. | It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug . |
|
|
1448
|
Friday, March 10, 2017, 09:19 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Field Measurements | The fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h. |
|
|
1449
|
Tuesday, March 14, 2017, 07:34 |
chad fisher | South Hot-Cell | Maintenance | | | Hot Cell Fields | I have re-measured the fields in the hot
cell. Fields at shield door Al cover are
101 uSv\h, in cell at the east manipulator |
|
|
1450
|
Tuesday, March 14, 2017, 11:46 |
chad fisher | South Hot-Cell | Maintenance | | | 'Z' motion cable dry run | Did a dry run with the latest procedure
with Dan Mcdonald. Elapsed time was approximately
30 min. |
|
|
1451
|
Wednesday, March 15, 2017, 07:45 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Fields | I have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the |
|
|
1453
|
Thursday, March 16, 2017, 12:24 |
chad fisher | South Hot-Cell | Maintenance | | | West 'Z' motion cable replacement | The west 'Z' motion cable on the east manipulator
has successfully been replaced. The job took
slightly less than an hour (including inspection |
|
|
1454
|
Tuesday, March 21, 2017, 10:05 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay. | All target in the ISAC spent target vault
have been either assayed or had their fields
measured or both. |
|
|
1459
|
Thursday, March 23, 2017, 11:22 |
Grant Minor | Crane | Maintenance | | | Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist | Strange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist |
|
|
1461
|
Friday, March 24, 2017, 11:12 |
Keith C Ng | Spent Target Vault | Standard Operation | | | 2A window transfer | Transfered the 2A window from the ISAC
Storage Vault to the Cyclotron Vault Tunnel
Storage area. RPG storage form attached. |
|
|
1462
|
Friday, March 24, 2017, 11:19 |
Keith C Ng | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault |
|
|
|
1463
|
Friday, March 24, 2017, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A window | 2A window has been removed from the vault. | 2A window has been removed from the vault
and moved over the cyclotron vault tunnels.
Attached is the updated storage vault list. |
|
|
1464
|
Monday, March 27, 2017, 06:33 |
David Wang | ITE | Standard Operation | | | ITE clean up | ITE clean up is done. HV cage inside
is wiped. |
|
|
1465
|
Monday, March 27, 2017, 12:55 |
David Wang | Spent Target Vault | Repair | | | S/W silo rust clean up | Rust on S/W silo and cover plate stored
at silo area are cleaned up. |
|
|
1476
|
Tuesday, April 04, 2017, 14:39 |
David Wang | Crane | Standard Operation | | | Crane check main hoist on jogging with shielding plug lifted. | Today, I checked TH crane main hoist
when shielding plug is installed into ITE
pit. I did some jogging actions on |
|
|
1479
|
Wednesday, April 05, 2017, 11:57 |
David Wang | ITE | Maintenance | | | ITE target module flange o-ring repalcement | ITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. |
|
|
1482
|
Thursday, April 06, 2017, 15:11 |
Grant Minor | Crane | Maintenance | | | Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017 |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
1483
|
Thursday, April 06, 2017, 15:16 |
Anders Mjos | Conditioning Station | Maintenance | | | Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1 | Installation by Marshall. Dave M from controls
adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation |
|