Message ID: 1421     Entry time: Tuesday, January 17, 2017, 13:45
Author: Isaac Earle 
Category: North Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: NHC ducting installed 

 The new ducting section connecting the existing duct termination in the TCS space to the NHC partition wall has been installed by Smith Sheet Metal contractors.  The installation drawing is IRH1618.  There was not enough clearance between the duct pipe and the TCS vessel to butt weld the new ductwork as originally intended.  Instead a flange was welded to the existing pipe and also to the new section and the two were bolted together.  Drawings of the modifications have been provided by the contractor, and as-built drawings will be completed at a later date.  There was not time for the contractor to fabricate a gasket for the flanged joint, so one will be installed by TRIUMF at a later date and included in the as-built drawing package.

Attachment 1: IMG_7688.JPG  103 kB  | Show | Hide all
Attachment 2: IMG_7716.JPG  102 kB  | Show | Hide all
Attachment 3: IMG_7723.JPG  106 kB  | Show | Hide all
Attachment 4: IMG_7721.JPG  117 kB  | Show | Hide all
ELOG V2.9.2-2455