Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 113 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1443   Thursday, March 02, 2017, 15:02 Isaac EarleNorth Hot-CellDevelopment  NHC roughing filter installed The roughing filter assembly (RFM0001D)
has been installed at the ventilation exhaust
hole on the NHC partition wall.  The
 IMG_8014.JPGIMG_8018.JPGIMG_8019.JPG 
  1444   Monday, March 06, 2017, 08:01 David WangCoolingRepair  HALCW resin tank replacement.HALCW resin tank has been replaced. The
old tank is stored in middle-west silo now.
The field on old resin tank bottom is about
 11x 
  1445   Tuesday, March 07, 2017, 09:25 David WangITWRepair  ITW HALCW 2" return line ball valve seals replacement.Leaking seals on ITW HALCW 2" return
line ball valve have been replaced. 8 liter
waters are drained out for this job. Water
  
  1446   Tuesday, March 07, 2017, 14:41 David WangITEMaintenance  ITE dump plug water circuit is closed for ITE IG1S small surge.It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug .
  
  1448   Friday, March 10, 2017, 09:19 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Field MeasurementsThe fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h.
  
  1449   Tuesday, March 14, 2017, 07:34 chad fisherSouth Hot-CellMaintenance  Hot Cell FieldsI have re-measured the fields in the hot
cell. Fields at shield door Al cover are
101 uSv\h, in cell at the east manipulator
  
  1450   Tuesday, March 14, 2017, 11:46 chad fisherSouth Hot-CellMaintenance  'Z' motion cable dry runDid a dry run with the latest procedure
with Dan Mcdonald. Elapsed time was approximately
30 min.
  
  1451   Wednesday, March 15, 2017, 07:45 chad fisherSouth Hot-CellMaintenance  South Hot Cell FieldsI have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the
  
  1453   Thursday, March 16, 2017, 12:24 chad fisherSouth Hot-CellMaintenance  West 'Z' motion cable replacementThe west 'Z' motion cable on the east manipulator
has successfully been replaced. The job took
slightly less than an hour (including inspection
  
  1454   Tuesday, March 21, 2017, 10:05 Travis CaveSpent Target VaultStandard Operation  Spent target assay.All target in the ISAC spent target vault
have been either assayed or had their fields
measured or both.
 Vault_Storage_March_20_2017.pdf 
  1459   Thursday, March 23, 2017, 11:22 Grant MinorCraneMaintenance  Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & HoistStrange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist
 Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdfUpdate_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdfRe__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf 
  1461   Friday, March 24, 2017, 11:12 Keith C NgSpent Target VaultStandard Operation  2A window transferTransfered the 2A window from the ISAC
Storage Vault to the Cyclotron Vault Tunnel
Storage area. RPG storage form attached.
 2017mar24_vault_tunnel_storage_form(1).pdf 
  1462   Friday, March 24, 2017, 11:19 Keith C NgSpent Target VaultStandard Operation 2A3 windowWindow now in vault


   
        
            
 2017mar24_vault_tunnel_storage_form(1).pdf 
  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.2A window has been removed from the vault
and moved over the cyclotron vault tunnels. 
Attached is the updated storage vault list.
 Vault_Storage_March_24_2017.pdf 
  1464   Monday, March 27, 2017, 06:33 David WangITEStandard Operation  ITE clean upITE clean up is done.  HV cage inside
is wiped.
  
  1465   Monday, March 27, 2017, 12:55 David WangSpent Target VaultRepair  S/W silo rust clean upRust on S/W silo and cover plate stored
at silo area are cleaned up.
 rust_removal_at_sw_silo_001.JPGrust_removal_at_sw_silo_002.JPGrust_removal_at_sw_silo_003.JPGrust_removal_at_sw_silo_004.JPGrust_removal_at_sw_silo_005.JPG 
  1476   Tuesday, April 04, 2017, 14:39 David WangCraneStandard Operation  Crane check main hoist on jogging with shielding plug lifted. Today, I checked TH crane main hoist 
when shielding plug is installed into ITE
pit. I did  some jogging actions on
  
  1479   Wednesday, April 05, 2017, 11:57 David WangITEMaintenance  ITE target module flange o-ring repalcementITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. 
  
  1482   Thursday, April 06, 2017, 15:11 Grant MinorCraneMaintenance  Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

  
  1483   Thursday, April 06, 2017, 15:16 Anders MjosConditioning StationMaintenance  Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1Installation by Marshall. Dave M from controls
adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation
  
ELOG V2.9.2-2455