2576
|
Wednesday, May 01, 2024, 14:51 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 has been moved form TCS to SHC. |
Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth. |
|
2577
|
Thursday, May 02, 2024, 09:00 |
David Wang | ITW | Standard Operation | TM4 | | Annual ITW water signal interlock check has been done. |
Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine. |
|
2578
|
Thursday, May 02, 2024, 14:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | UCx#44 | TM3 has been moved from SHC to TCS. |
TM3 has been moved from SHC to TCS by David and Frank. The move is smooth. |
|
2579
|
Thursday, May 02, 2024, 14:58 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 with UCx#44 electrical check and leak check. |
TM3 with UCx#44 electrical check and leak check are good. see attachment.
HS line 70 psi helium pressure test at TCS: no leak at 0.0xe-9 torr. |
Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf
|
|
|
2580
|
Thursday, May 02, 2024, 15:23 |
David Wang | South Hot-Cell | Development | TM3 | | Leak check on TM3 new containment box window line VCR fittings. |
After new containment box installation on TM3, Chad and I did a helium spray leak check on two VCR fittings on front side water lines. they are leak free.
Helium pressurize window water line to 70 psi for 3minutes. No response on leak detector which is 0.0xe-9 atm.cc/sec. |
|
2583
|
Tuesday, May 07, 2024, 09:47 |
David Wang | ITE/ITW | Maintenance | TM2 | | Broken TM2:TP2 has been replaced. |
Broken TM2:TP2 has been replaced otday by a new TV-1001 nav pump supplied by vacuum group. replaced pump seris number:201281. new pump series number:IT23431008. TPs replacement history sheet will be updated by Frank. I will put comment on this e fault and let operator to close it. |
|
2585
|
Wednesday, May 08, 2024, 12:36 |
David Wang | Conditioning Station | Standard Operation | TM3 | UCx#44 | TCS was argon vented this morning between 7:00 to 8:30 am. |
TCS was argon vented this morning between 7:00 to 8:30 am before module was moved to ITE. |
|
2586
|
Wednesday, May 08, 2024, 12:37 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form TCS to ITE |
The move is smooth and successful. |
|
2589
|
Friday, May 10, 2024, 09:04 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been connected in ITE. |
Tm3 has been connected in ITE. see attachment. |
Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
|
|
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. |
ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal. |
|
2593
|
Tuesday, May 21, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | Lp Febiad empty | Tm4 has been disconnected in ITW. |
Tm4 has been disconnected in ITW per document 141576. Checklist is done. HS line is purged. |
Attachment 1: TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
|
|
|
2594
|
Tuesday, May 21, 2024, 11:46 |
David Wang | ITW | Standard Operation | TM4 | LP febiad empty. | Tm4 has been moved from ITW to SHC. |
Tm4 has been moved from ITW to SHC. the move is smooth. |
|
2595
|
Wednesday, May 22, 2024, 12:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. the move is smooth. |
|
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. |
electrical check and leak check were done on TM4 UCx#45 target at SHC. everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done. No leak. |
Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
|
|
|
2598
|
Thursday, May 23, 2024, 11:10 |
David Wang | MAA | Standard Operation | | | BL2A MAA ASU test. |
MCR Travis Curucz and I finished BL2A MAA ASU test per document 154779. everything works fine. Travis kept the test document. |
|
2600
|
Tuesday, May 28, 2024, 07:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx#45 | TCS was argon vented this morning between 6:00 and 7:30am. |
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW. |
|
2601
|
Tuesday, May 28, 2024, 10:13 |
David Wang | ITW | Standard Operation | TM4 | UCx#45 | Tm4 has been moved from TCS to ITW. |
Tm4 has been moved from TCS to ITW. the move is smooth. |
|
2603
|
Thursday, May 30, 2024, 11:08 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 was moved from silo to TCS yesterday morning. |
TM2 was moved from silo to TCS yesterday morning. The move is smooth. TCS vacuum system was started after. TCS and TM2 pumping down is ok so far. |
|
2605
|
Wednesday, June 05, 2024, 11:25 |
David Wang | Conditioning Station | Standard Operation | | | refilled TCS:TK2 to 27.4 inches. |
refilled TCS:TK2 to 27.4 inches to compensate water lost during THC filters change. |
|
2606
|
Wednesday, June 05, 2024, 11:32 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system filters have been changed. |
TCS water system five filters were changed yesterday by plant group Dan.T. Service labels on filters are updated. No water leak after job. |