2586
|
Wednesday, May 08, 2024, 12:37 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form TCS to ITE | The move is smooth and successful. |
|
2589
|
Friday, May 10, 2024, 09:04 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been connected in ITE. | Tm3 has been connected in ITE. see
attachment. |
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|
2593
|
Tuesday, May 21, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | Lp Febiad empty | Tm4 has been disconnected in ITW. | Tm4 has been disconnected in ITW per document
141576. Checklist is done. HS line
is purged. |
|
2594
|
Tuesday, May 21, 2024, 11:46 |
David Wang | ITW | Standard Operation | TM4 | LP febiad empty. | Tm4 has been moved from ITW to SHC. | Tm4 has been moved from ITW to SHC. the
move is smooth. |
|
2595
|
Wednesday, May 22, 2024, 12:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. the
move is smooth. |
|
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. | electrical check and leak check were done
on TM4 UCx#45 target at SHC. everything
is ok. See attachment |
|
2598
|
Thursday, May 23, 2024, 11:10 |
David Wang | MAA | Standard Operation | | | BL2A MAA ASU test. | MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept the test document. |
|
2600
|
Tuesday, May 28, 2024, 07:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx#45 | TCS was argon vented this morning between 6:00 and 7:30am. | TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW. |
|
2601
|
Tuesday, May 28, 2024, 10:13 |
David Wang | ITW | Standard Operation | TM4 | UCx#45 | Tm4 has been moved from TCS to ITW. | Tm4 has been moved from TCS to ITW.
the move is smooth. |
|
2603
|
Thursday, May 30, 2024, 11:08 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 was moved from silo to TCS yesterday morning. | TM2 was moved from silo to TCS yesterday
morning. The move is smooth.
TCS vacuum system was started after. TCS |
|
2605
|
Wednesday, June 05, 2024, 11:25 |
David Wang | Conditioning Station | Standard Operation | | | refilled TCS:TK2 to 27.4 inches. | refilled TCS:TK2 to 27.4 inches to compensate
water lost during THC filters change. |
|
2606
|
Wednesday, June 05, 2024, 11:32 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system filters have been changed. | TCS water system five filters were
changed yesterday by plant group Dan.T. Service
labels on filters are updated. No water |
|
2608
|
Wednesday, June 12, 2024, 10:18 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is moved from TCS to silo this morning | TM2 is moved from TCS to silo this morning.
The move is smooth. |
|
2609
|
Thursday, June 13, 2024, 11:44 |
David Wang | Conditioning Station | Repair | TM2 | | Replaced several o ring seals on TM2 service cap. | couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum o rings. Replaced these |
|
2611
|
Friday, June 14, 2024, 11:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 UCx#44 after operation electrical check at SHC | TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the |
|
2612
|
Friday, June 14, 2024, 11:56 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form ITE to SHC. | Tm3 has been moved form ITE to SHC. the
move is smooth. |
|
2614
|
Monday, June 17, 2024, 07:36 |
David Wang | ITE | Repair | | | IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top.. | IG1S elbow o ring seal and a blank off
cap o-ring seal beside the elbow were replaced
on ITE entrance module top last Friday. IG1s |
|
2616
|
Tuesday, June 18, 2024, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 electrical check without target. | Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV |
|
2619
|
Wednesday, June 19, 2024, 08:10 |
David Wang | Waste Package/Ship | Development | | | 5 gallon spent target pail, spent target lifting long pole and hook assembly load test | 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David. Load |
|