ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2537   Friday, February 02, 2024, 07:48 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary vacuum vessel
leak check has been done. SST bellow for
2A3M19  wire scanner on entrance module
  
  2538   Tuesday, February 06, 2024, 13:28 David WangITWMaintenance  ITW exit 1 module has been disconnected and reconnected for o ring replacementITW exit 1 module was disconnected 
for Exit module flange o -ring replacement
yesterday. After oring replacement, the module
  
  2539   Tuesday, February 06, 2024, 13:36 David WangITWMaintenance  ITW exit 1 module tank flange o ring has been replaced. ITW exit 1 module tank flange o ring has
been replaced. the old o r-ing was completely
flat in slot without elastic property. 
  
  2544   Thursday, February 15, 2024, 13:52 David WangITWStandard Operation  ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement. ITW entrance module and exit 1 module
leak check on module service cap/top air
to vacuum seals and module to tank flange 
  
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2553   Monday, March 25, 2024, 10:53 David WangITERepair  ITE entrance module has been moved from TCS to ITE.ITE entrance module has been moved from
TCS to ITE. The move is smooth. 
  
  2554   Monday, March 25, 2024, 10:55 David WangITEStandard Operation  ITE entrance module has been reconnected in ITE pit. ITE entrance module has been reconnected
in ITE pit per document 190510. 
  
  2555   Wednesday, March 27, 2024, 09:49 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved to SHC from silo.Tm3 has been moved to SHC from silo. the
move is smooth. 
  
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  
  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
The move is smooth. 
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2560   Monday, April 08, 2024, 09:29 David WangCoolingStandard Operation  HALCW system general inspection. water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves
  
  2561   Thursday, April 11, 2024, 06:07 David WangSouth Hot-CellStandard OperationTM3 Tm3 was moved from silo to SHC yesterday.Tm3 was moved from silo to SHC yesterday.
the move is smooth. 
  
  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday. TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when
  
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out. Monday and Tuesday, I started TCS water
system and enabled the TCS chillers auto
stage in/out. I saw chiller 2 in/out three
  
  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today. ITH:MP1S pump inside lubricant was changed
today. old lubricant is dirty with dark color.
they are stored in sealed waste oil jug and
  
  2565   Friday, April 19, 2024, 10:44 David WangSouth Hot-CellDevelopmentTM3 TM3 water lines helium spray leak check at SHC.TM3 water lines helium spray leak check
at SHC is done. No leak has been found on
all lines. seeattachment
 Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf 
  2567   Wednesday, April 24, 2024, 10:15 David WangConditioning StationStandard OperationTM3 TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS.
The move is smooth. 
  