Friday, October 13, 2023, 11:51, David Wang, ITE/ITW, Maintenance, , , ITH:MP1 is replaced due to its poor performance.
Wednesday, January 03, 2024, 13:55, David Wang, ITW, Standard Operation, TM2, Ta#66, Disconnect TM2 in ITW.
Wednesday, January 03, 2024, 14:03, David Wang, ITW, Standard Operation, TM2, Ta#66, ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.
Thursday, January 11, 2024, 13:54, David Wang, Conditioning Station, Development, TM3, , TM3 servic cap air to vacumm seals leak check.
Thursday, January 11, 2024, 13:57, David Wang, ITW, Standard Operation, , , ITW entrance module has been disconnect.
Friday, January 12, 2024, 10:53, David Wang, South Hot-Cell, Standard Operation, , , ITW entrance module has been moved from ITW to SHC.
Friday, January 12, 2024, 11:25, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#66, Ta#66 post operation electrical check at SHC
Monday, January 22, 2024, 09:50, David Wang, ITW, Standard Operation, , , ITW entrance module has been moved from SHC to ITW.
Monday, January 22, 2024, 09:56, David Wang, ITW, Standard Operation, , , Entrance module has been connected in ITW pit.
Monday, January 22, 2024, 10:16, David Wang, ITE, Standard Operation, TM4, UCx#, Tm4 waterlines helium pressure test and TM service cap helium leak check.
Thursday, January 25, 2024, 07:27, David Wang, Crane, Standard Operation, , , Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02
Thursday, January 25, 2024, 07:31, David Wang, Crane, Standard Operation, , , Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01
Friday, January 26, 2024, 08:30, David Wang, South Hot-Cell, Standard Operation, TM4, , window line VCR leak check after containment box removal/installation.
Friday, January 26, 2024, 11:53, David Wang, Safe Module Parking, Standard Operation, TM4, , Tm4 has been moved to SMP.
Friday, January 26, 2024, 11:57, David Wang, Safe Module Parking, Standard Operation, TM4, , TM4 coil1, 2, and HS electrical check at SMP after module moving.
Friday, February 02, 2024, 07:48, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.
Tuesday, February 06, 2024, 13:28, David Wang, ITW, Maintenance, , , ITW exit 1 module has been disconnected and reconnected for o ring replacement
Tuesday, February 06, 2024, 13:36, David Wang, ITW, Maintenance, , , ITW exit 1 module tank flange o ring has been replaced.
Thursday, February 15, 2024, 13:52, David Wang, ITW, Standard Operation, , , ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement.
Friday, February 16, 2024, 11:48, David Wang, Cooling, Maintenance, , , high active water transferr to holding tank