1011
|
Friday, July 24, 2015, 10:04 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been moved from ITE to block storage area. | Dan and I moved 5 shielding blocks from
ITE to block storage area. The move is smooth. |
|
1017
|
Monday, July 27, 2015, 15:46 |
David Wang | South Hot-Cell | Standard Operation | | | The yellow steel plug is put on SHC in TH | The yellow steel plug is put on SHC in
TH. The spent target is inside the SHC.The
field around the SHC area in TH is so high |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
1027
|
Thursday, July 30, 2015, 14:05 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31 | Spent target moved | SiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed |
|
1028
|
Friday, July 31, 2015, 09:47 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Weekly update of Target Hall schedule after
so many jobs have been finished in this week.
See attachment 1, 2 |
|
1029
|
Thursday, August 06, 2015, 10:26 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Measurments and Assays | All targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details. |
|
1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 | Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule |
|
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
|
1066
|
Thursday, September 10, 2015, 08:59 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Mait. and field check Sept. 4 | Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal |
|
1075
|
Tuesday, September 22, 2015, 13:15 |
David Wang | South Hot-Cell | Standard Operation | | Ta#46 | Leak check on TM4 HS water line with new Ta#46 target. at SHC | Chad and I leak checked the HS line at
SHC. No leak. Leak rate 0.0xE-9atm.cc/sec. |
|
1082
|
Friday, September 25, 2015, 07:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | weekly update see attachment |
|
1083
|
Friday, September 25, 2015, 08:21 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#13 | Spent Target move | The spent UC#13 target has been moved from
the south hot cell to the ISAC spent target
vault. It was placed pail #128 and in tray |
|
1089
|
Thursday, October 01, 2015, 09:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets transfered to mini storage. | In preparation for shipping of the spent
targets five have been moved to the mini
storage. The following target were moved |
|
1090
|
Monday, October 05, 2015, 10:19 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance |
|
1097
|
Tuesday, October 13, 2015, 10:53 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update schedule. TM3 evaluation
schedule in Nov is added.
update the schedule after the |
|
1108
|
Tuesday, October 20, 2015, 12:49 |
Dan McDonald | ITW | Standard Operation | | SiC#32 | Tm2 hook up In ITW | Lower and disconnect TM2 from crane in
ITW, proceed with hooking up TM2 as per checklist
with Anders. Double check flow meters and |
|
1109
|
Tuesday, October 20, 2015, 13:52 |
chad fisher | South Hot-Cell | Maintenance | | | TM4 Febiad coil line disposal | The febiad coil line removed from TM4 has
been cut into pieces small enough to be disposed
of in a 5 gal pal. The line was cut with |
|
1110
|
Wednesday, October 21, 2015, 09:49 |
chad fisher | South Hot-Cell | Repair | | | Manipulator handle repair | Rebuild handle of manipulator serial 7986
(currently in the east position) and replaced
broken snap ring 5555-18h on west side of |
|