  2472   Tuesday, August 08, 2023, 12:59 David WangITWStandard OperationTM2SiC #6TM2 SiC#6 dhas been disconnected in ITW

TM2 SiC#6 has been disconnected in ITW. See check list

Attachment 1: TiC#6_TM2_disconnection_checklist.pdf
TiC#6_TM2_disconnection_checklist.pdf TiC#6_TM2_disconnection_checklist.pdf TiC#6_TM2_disconnection_checklist.pdf
  2473   Tuesday, August 08, 2023, 13:01 David WangNorth Hot-CellStandard OperationTM2TiC#6TM2 TiC#6 post run electrical check at NHC.

TM2 TiC#6 post run electrical check has been done at TCS. See attachment

Attachment 1: TiC#6_post_run_electrical_check.pdf
TiC#6_post_run_electrical_check.pdf TiC#6_post_run_electrical_check.pdf
  2474   Wednesday, August 09, 2023, 09:41 David WangNorth Hot-CellStandard OperationTM2Nb#10TM2 Nb# 10 electrical and leak check at NHC

Nb#10 has been installed on TM2 . electrical and leak check on HS line are good. See attachment.

Attachment 1: Nb_#10_electrical_and_leak_check_at_NHC.pdf
Nb_#10_electrical_and_leak_check_at_NHC.pdf Nb_#10_electrical_and_leak_check_at_NHC.pdf Nb_#10_electrical_and_leak_check_at_NHC.pdf
  2475   Wednesday, August 09, 2023, 13:13 David WangConditioning StationStandard OperationTM2Nb#10Tm2 Nb#10 has been connect at TCS.

TM2 Nb#10 has been connect at TCS. TCS water system and vacuum system have been started. Everything looks ok so far. TCS Faraday cage is secured for TM2 conditioning at TCS.

  2495   Friday, October 13, 2023, 11:46 David WangCoolingMaintenance  HALCW system O2 sensor service and calibration.

HALCW system O2 sensor service and calibration were done in Sep 26th. electrolyte and membrane on rose mount sensor 499ADO were refilled and replaced. Sensor was zero and full scale calibrated. The sensor works fine after the job.

  2496   Friday, October 13, 2023, 11:51 David WangITE/ITWMaintenance  ITH:MP1 is replaced due to its poor performance.

ITH:MP1 is replaced this morning due to its poor performance started yesterday afternoon. The general field in pit is about 260usv/hr. the contact field on pump is 2.0 msv/hr. New pump works good. Lubricant in pump will be drained next week. then motor will be removed. The pump body will be bagged and stored in silo area.

  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.

TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.

Attachment 1: TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.

ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other water lines are below 3.0XE-9atm.cc/sec.

Attachment 1: ITW_2024_shut_down_leak_check.pdf
ITW_2024_shut_down_leak_check.pdf
  2520   Thursday, January 11, 2024, 13:54 David WangConditioning StationDevelopmentTM3 TM3 servic cap air to vacumm seals leak check.

After Tm3 service tray and service cap installation, TM3 service cap air to vacuum seals leak check has been done at TCS. TCS:IG1 and IG1S are at low E-7 torr range.  leak detector base  0.0XE-9 atm.cc/sec,  base pressure0.0X E-4 torr.  I sprayed helium to all new air to vacuum seals on service cap. No leak on seals. The leak check has been repeated  2 times with same result.   

  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.

ITW entrance module has been disconnected per document190510. It will be moved to SHC for diagnostic group tomorrow.

  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC.

ITW entrance module has been moved from ITW to SHC. The move is smooth.  I cleaned entrance module tank flange and o r-ing slot.  entrance module tank flange o ring  is replaced .

  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHC

Ta#66 post operation electrical check was done at SHC this Monday. See attachment.

Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
TM2_Ta66_post__oeration_electrical_check.pdf
  2525   Monday, January 22, 2024, 09:50 David WangITWStandard Operation  ITW entrance module has been moved from SHC to ITW.

ITW entrance module has been moved from SHC to ITW. A slightly bump on module shielding block bottom side corner to tank vessel side when lowed module into tank. No big concern on this slight  bumping. Otherwise the move is perfect.

 

 

 

 

 

 

  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.

Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".

 

  2527   Monday, January 22, 2024, 10:16 David WangITEStandard OperationTM4UCx#Tm4 waterlines helium pressure test and TM service cap helium leak check.

Tm4 waterlines helium pressure test and TM service cap helium leak check was done last Friday. All water lines were pressurized with 70psi helium for 3 minutes each. The 3 minutes stable leak rate on all lines are less than 4.0 X E-9atm.cc/sec. some of lines had surging leak rate to 2xE-8 atm.cc/sec at the first 10 seconds of pressurization which should be a gas hammer result at the beginning. Based on the numbers, I would say all water lines are leak free still.  I did helium spray on TM4 service cap. There could be a small leak in high E-9 atm. cc/sec on ion gauge and steer service panel o-ring.  I will replace this o-ring when module is moved out of ITE. Other seals are leak free or less than 2.5X E-9 atm.cc/sec leak rate which are good. I am pretty confirm there is a small leak on ITE entrance module top. The leak rate and location will be confirmed when the rest of leak checks in ITE pit are done.

  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02

Tom Gauss inspected  two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for 2024. Inspection tags have been issued and attached to frames. He has inspection record on them. 

  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01

Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates for year 2024. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection, The inspection tag  was issued and attached to pin. Tom has an inspection record on this job.

  2533   Friday, January 26, 2024, 08:30 David WangSouth Hot-CellStandard OperationTM4 window line VCR leak check after containment box removal/installation.

Chad and I did window line VCRs leak check after containment box removal/installation.  The first  pair of  VCRs have leak. Chad changed VCRs. Both VCr fittings on window lines are completely leak free to 0.0 XE-9 atm.cc/sec now.

  2534   Friday, January 26, 2024, 11:53 David WangSafe Module ParkingStandard OperationTM4 Tm4 has been moved to SMP.

TM4 has been moved to SMP. The move is smooth. I started SMP vacuum pump. The TM4 and SMP vessel is under vacuum now.

  2535   Friday, January 26, 2024, 11:57 David WangSafe Module ParkingStandard OperationTM4 TM4 coil1, 2, and HS electrical check at SMP after module moving.

TM4 coil1, 2 and HS are all OL at 250V at SMP after module move. This week, Chad and Carl fixed short issue on coil1, 2 and HS by insert dropped ultem ring back to position at SHC.