ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  53   Wednesday, November 16, 2011, 07:46 chad fisherSouth Hot-CellStandard OperationTM1TaC#1Inspection of TaC#1Inspection of TaC#1 showed that the oven
was indeed broken on the A+ (left oven leg)
side of the central block.
  
  2622   Monday, June 24, 2024, 14:37 Carla BabcockSouth Hot-CellDevelopmentTM3UCx#44Inspection of TM3 and UCx#44 after no-protons runTM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided
 MicrosoftTeams-image_(61).pngMicrosoftTeams-image_(62).pngMicrosoftTeams-image_(60).pngMicrosoftTeams-image_(63).png 
  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and  plates ITA6550-01
yesterday. He certified the use of these
  
  1622   Thursday, September 21, 2017, 16:26 Anders MjosSouth Hot-CellStandard OperationTM2 Inspection of Source TrayChad and Anders inspected the Source Tray
today using the camera in the hot cell. A
dark spot was observed on one of the four
 TM2_Source_Tray_EE_Insulator.pdf 
  443   Wednesday, September 04, 2013, 19:01 Grant MinorSouth Hot-CellRepairTM3 Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013)Yesterday, Grant entered the Ante Room
with David Wang to visually inspect the two
sets of failed c-seals from the Heat Shield
 TM3_Heat_Shield_Water_Block_-_c-seal_vs_delta_seal_DRAFT_3Sept2013.pdf 
  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames.
 2022-01-19_170.jpg2022-01-19_173.jpg2022-01-19_175.jpg2022-01-19_176.jpg 
  1562   Thursday, June 22, 2017, 11:10 chad fisherSouth Hot-CellMaintenance  In cell airlineThe in cell airline has preemptively been
replaced. The hose was, as far as I know
the original.
  
  2784   Tuesday, March 11, 2025, 08:44 David WangITWStandard Operation  ITW:TP3,TP4, TP1S TP4S have been started since March 06th.To prevent TP bearings seize during shut
down, ITW:TP3,TP4, TP1S TP4S have been started
since March 06th. They work fine.  The
  
  718   Monday, July 28, 2014, 17:26 Ron KuramotoITWRepair  ITW:IV5 Air leak repairAir leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room.  The
 DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg 
  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshootingMeasured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows
 2018-11-13_FC5.pdf 
  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installedYesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system.
 FC5_limit_switch.jpg 
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. ITW
 and TM2 primary and secondary vacuum
 ITW_vacuum_leak_check_2023.pdf 
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  
  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit. In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked.  ITW BV1 and BV2
  
  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum  cleaned. HV cage
  
  240   Thursday, January 24, 2013, 13:30 David WangITWStandard OperationTM1 ITW-TM1 2013 winter shut down leak check.2013 winter shut down ITW-TM1 primary vacuum
vessel, secondary vacuum vessel, and water
lines leak check: connected leak detector
  
  1234   Monday, May 16, 2016, 11:16 David WangITWStandard OperationTM1 ITW, TM1 turbo-pumps are swithched offI let isac opp switched off ITW turbo-pumps.
The argon vent valve in electrical room is
opened. The ITW argon venting will be started 
  
  1861   Tuesday, January 22, 2019, 09:56 David WangITWMaintenanceTM2 ITW water system maintenance.ITW water system maintenance is done. All
working paddle wheels and coils are replaced.
ITW water system polyurethane tubes are replaced
  