ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
2622
|
Monday, June 24, 2024, 14:37 |
Carla Babcock | South Hot-Cell | Development | TM3 | UCx#44 | Inspection of TM3 and UCx#44 after no-protons run | TM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided |
   |
2414
|
Friday, January 27, 2023, 07:25 |
David Wang | Crane | Standard Operation | | | Inspection of TH crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
1622
|
Thursday, September 21, 2017, 16:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | | Inspection of Source Tray | Chad and Anders inspected the Source Tray
today using the camera in the hot cell. A
dark spot was observed on one of the four |
|
443
|
Wednesday, September 04, 2013, 19:01 |
Grant Minor | South Hot-Cell | Repair | TM3 | | Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013) | Yesterday, Grant entered the Ante Room
with David Wang to visually inspect the two
sets of failed c-seals from the Heat Shield |
|
2294
|
Wednesday, January 19, 2022, 13:26 |
David Wang | Crane | Standard Operation | | | Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames. |
   |
1562
|
Thursday, June 22, 2017, 11:10 |
chad fisher | South Hot-Cell | Maintenance | | | In cell airline | The in cell airline has preemptively been
replaced. The hose was, as far as I know
the original. |
|
2784
|
Tuesday, March 11, 2025, 08:44 |
David Wang | ITW | Standard Operation | | | ITW:TP3,TP4, TP1S TP4S have been started since March 06th. | To prevent TP bearings seize during shut
down, ITW:TP3,TP4, TP1S TP4S have been started
since March 06th. They work fine. The |
|
718
|
Monday, July 28, 2014, 17:26 |
Ron Kuramoto | ITW | Repair | | | ITW:IV5 Air leak repair | Air leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room. The |
  |
1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting | Measured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows |
|
1824
|
Thursday, November 22, 2018, 08:55 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal limit switch installed | Yesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system. |
|
2401
|
Friday, January 06, 2023, 10:38 |
David Wang | ITW | Standard Operation | TM2 | | ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. | ITW
and TM2 primary and secondary vacuum |
|
2762
|
Monday, February 03, 2025, 13:04 |
David Wang | Safe Module Parking | Maintenance | | | ITW/ITW 24VDC electrical connectors for TP BVs MRO. | ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done. |
|
2416
|
Monday, February 13, 2023, 09:57 |
David Wang | ITW | Maintenance | | | ITW/ITE primary vacuum back up lines and BVs leak check in target pit. | In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked. ITW BV1 and BV2 |
|
2752
|
Tuesday, January 21, 2025, 10:46 |
David Wang | ITE/ITW | Standard Operation | | | ITW/ITE pit general annual cleaning up. | ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum cleaned. HV cage |
|
240
|
Thursday, January 24, 2013, 13:30 |
David Wang | ITW | Standard Operation | TM1 | | ITW-TM1 2013 winter shut down leak check. | 2013 winter shut down ITW-TM1 primary vacuum
vessel, secondary vacuum vessel, and water
lines leak check: connected leak detector |
|
1234
|
Monday, May 16, 2016, 11:16 |
David Wang | ITW | Standard Operation | TM1 | | ITW, TM1 turbo-pumps are swithched off | I let isac opp switched off ITW turbo-pumps.
The argon vent valve in electrical room is
opened. The ITW argon venting will be started |
|
1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. | ITW water system maintenance is done. All
working paddle wheels and coils are replaced.
ITW water system polyurethane tubes are replaced |
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
2782
|
Friday, March 07, 2025, 09:07 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock annual check is done. | Chole and I finished ITW water signals
interlock. No issue. |
|
1201
|
Friday, April 08, 2016, 08:48 |
David Wang | ITW | Standard Operation | | | ITW water signal interlock check. | I did a ITW water signals interlock check
with ISAC opp. They are checked once a year
before first beam on. |
|