  297   Monday, April 15, 2013, 11:00 chad fisherSouth Hot-CellStandard OperationTM3 Items for TM3 dummy target installationNew gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow.
  
  2091   Friday, March 27, 2020, 08:45 Matthew GareauNorth Hot-CellMaintenance  Issues with the manipulators This is a link to all of the issues
with the NHC manipulators that I know of

  
  2445   Wednesday, May 24, 2023, 17:25 Carla BabcockITERepairTM4TiC#5Issues with anode shortWhen I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common.
  
  482   Monday, September 30, 2013, 16:04 Bevan MossConditioning StationRepairTM3NiO#2Ion gauge filament replacement  The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed
  
  2489   Thursday, September 14, 2023, 11:16 Adam NewsomeSpent Target VaultDevelopment Ta #58Investigation of Pail 211 (Ta #58)Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the
 Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf 
  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment
 Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf 
  1395   Tuesday, November 08, 2016, 14:04 Isaac EarleNorth Hot-CellDevelopment  Interference check with TCS turbo pump and proposed NHC duct routingDavid Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement
 IMG_7577.JPGIMG_7583.JPGIMG_7582.JPG 
  1621   Thursday, September 21, 2017, 12:07 chad fisherSouth Hot-CellRepairTM2 Insulator ReplacementInsulators ITD0053 and 54 have been replaced.
All fasteners torqued to 56 in lbs.
 
  
  2690   Monday, September 23, 2024, 16:06 Aaron TamSouth Hot-CellRepairTM3 Insulator Addition to Water block September 23, 2024 - C. Fisher 

    Containment box removed

   Insulator installed
    New
 c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif 
  1842   Wednesday, December 19, 2018, 14:41 Anders MjosConditioning StationStandard Operation No targetInstalled Shield Block on TCSFrank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational
  
  536   Wednesday, November 06, 2013, 10:41 David WangSouth Hot-CellRepairTM2 Installed 2 turbopumps on TM2Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation.
  
  1634   Thursday, October 05, 2017, 11:04 Anders MjosITWMaintenance  Installation of new valve for module move ventilationDavid installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference
  
  1483   Thursday, April 06, 2017, 15:16 Anders MjosConditioning StationMaintenance  Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1Installation by Marshall. Dave M from controls
adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation
  
  1781   Wednesday, September 12, 2018, 15:30 Isaac EarleNorth Hot-CellDevelopment  Installation of NHC operator-level lighting completed Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801.  2" x 2"
 LEDs_and_manipulators.jpgLEDs.jpgcords.jpg 
  1663   Wednesday, November 15, 2017, 08:55 David WangConditioning StationStandard Operation  Install shield plug onto TCS and pumping down TCS.Shielding plug is installed onto TCS. TCS
is being pumped down to keep it under vacuum
for the rest of the year.
  
  1102   Wednesday, October 14, 2015, 14:49 David WangSouth Hot-CellStandard OperationTM2 Install new high current cables to TM2I installed a set of new high current cables
for TM2 Febiad run. The top of TM2 
is configured to Febiad mode. See attachments
 TM2_Febiad_High_current_cables_047.JPGTM2_Febiad_High_current_cables_048.JPGTM2_Febiad_High_current_cables_049.JPG 
  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and   plates ITA6550-01
yesterday. He certified the use of these
  
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  53   Wednesday, November 16, 2011, 07:46 chad fisherSouth Hot-CellStandard OperationTM1TaC#1Inspection of TaC#1Inspection of TaC#1 showed that the oven
was indeed broken on the A+ (left oven leg)