Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1102     Entry time: Wednesday, October 14, 2015, 14:49
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Install new high current cables to TM2 

I installed a set of new high current cables for TM2 Febiad run. The top of TM2  is configured to Febiad mode. See attachments

Attachment 1: TM2_Febiad_High_current_cables_047.JPG  2.959 MB  | Show | Hide all
Attachment 2: TM2_Febiad_High_current_cables_048.JPG  2.624 MB  | Show | Hide all
Attachment 3: TM2_Febiad_High_current_cables_049.JPG  2.630 MB  | Show | Hide all
ELOG V2.9.2-2455