ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
968
|
Tuesday, June 30, 2015, 09:47 |
chad fisher | South Hot-Cell | Repair | | | manipulator repair | The right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv |
|
967
|
Monday, June 29, 2015, 10:51 |
David Wang | Conditioning Station | Repair | TM2 | | leak on TM2 side panel | There is an air to vacuum leak on TM2 service
cap side panel which we moved out during
the TM2 wiring job. The CS pumps are stopped |
|
966
|
Friday, June 26, 2015, 15:38 |
Anders Mjos | Conditioning Station | Development | TM2 | | Leak check and HV test | Roughing started by David.
Friday, June 26, 2015, 15:31: Started
TP1S |
|
965
|
Friday, June 26, 2015, 14:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 have been moved from SHC to CS | Bill and I mover TM2 from SHC to CS. The
move is smooth. I connected the CS vacuum
system after the move, and started the roughing. |
|
964
|
Friday, June 26, 2015, 09:45 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Containment box window waterlines have
been connected and leak checked and new containment
box cover installed. |
|
963
|
Friday, June 26, 2015, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Retrofit Status | On June 25th the following work was completed:
Optics tray was installed into TM2.
The lower fastener on the vertical cable |
|
962
|
Friday, June 26, 2015, 08:27 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - July 24 2015 | Update the Target hall Schedule after some
changes on TM2 refurbishment. See attachment
1,2 |
|
961
|
Wednesday, June 24, 2015, 13:49 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 new source tray vacuum leak check. | All water blocks seals and joints have
been leak checked. No leak has been found
on any of them. See attachment |
|
960
|
Wednesday, June 24, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Vacuum Leak Check | The following circuits have been vacuum
leak checked and have not registered any
leaks: |
|
959
|
Tuesday, June 23, 2015, 16:49 |
Anders Mjos | Conditioning Station | Development | | | TCS is beeing migrated to ISAC | by controls group (Dave Morris).
Friday, June 26, 2015
TCS has been migrated to ISAC controls. |
|
958
|
Tuesday, June 23, 2015, 14:19 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Water Block Jigs Removed | Both halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks. |
|
957
|
Tuesday, June 23, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | | | Left Manipulator Repair | The master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far. |
|
956
|
Friday, June 19, 2015, 13:00 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Install Status | Left manipulator now broken. Master side
however, so repair can take place Monday
or Tuesday. |
|
955
|
Friday, June 19, 2015, 11:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Progress | Window waterline has been successfully
connected using 1 1/2 inch long non-blunt
start 1/4-28 bolts. |
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
953
|
Friday, June 19, 2015, 11:43 |
David Wang | ITW | Repair | TM1 | | ITW external water leak on dump circuit | There was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May |
6x |
952
|
Friday, June 19, 2015, 09:37 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation - June 18, 2015 | The following work was done on
June 18 2015:
- Finished cleaning and polishing |
|
951
|
Thursday, June 18, 2015, 08:03 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Optics Tray Transfer | The TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source |
|
950
|
Wednesday, June 17, 2015, 14:21 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Waterblock Clean Polish | Fiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning |
|
949
|
Tuesday, June 16, 2015, 14:28 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation/Water Block Sealing Surface Clean | Today cleaning and polishing pads were
inserted into the hot cell.
Module side waterblock jig installation |
|