648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move | The East Entrance module has been moved
from the south west silo to the east target
station. The move went well. |
|
647
|
Friday, April 11, 2014, 18:17 |
Keith C Ng | ITE | Repair | | | 2a3 window - install | Today:
1) Installed new cradle and shortened
beam pipe section in wall penetration. |
|
646
|
Friday, April 11, 2014, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Helium pressure test on TM3 HS water line with new Ta target. at CS | The helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response |
6x |
645
|
Thursday, April 10, 2014, 14:03 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | TiC#4 | HV conditioning | The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly |
|
644
|
Wednesday, April 09, 2014, 11:10 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 heat shield circuit leack check at SHC | This Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec, |
|
643
|
Tuesday, April 08, 2014, 09:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station. |
|
642
|
Monday, April 07, 2014, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | TiC#4 | TiC#4 installation | TiC#4 has been installed onto TM3 |
|
641
|
Monday, April 07, 2014, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical test of TM#3 with TiC#4 attached.
See PDF. |
|
640
|
Monday, April 07, 2014, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | TM#3 electrical check at the south hot
cell with no target to give us a base line
and show that things are ok with the module |
|
639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
638
|
Friday, April 04, 2014, 14:59 |
Keith C Ng | ITE | Maintenance | | | measurement of new beam tube section | R. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with |
|
637
|
Friday, April 04, 2014, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south west silo to the south hot cell. |
|
636
|
Wednesday, April 02, 2014, 09:14 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved to the west
target station. |
|
635
|
Monday, March 31, 2014, 13:22 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #42 | HV conditioning | TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but |
|
634
|
Thursday, March 27, 2014, 10:47 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 with Ta#42 in the conditioning station
under vacuum electrical check. |
|
633
|
Wednesday, March 26, 2014, 08:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved from the
south hot cell to the conditioning station. |
|
632
|
Wednesday, March 26, 2014, 06:57 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Leak check on TM4 HS water line with new Ta #42 target. | Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 |
|
631
|
Tuesday, March 25, 2014, 13:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 was checked electrically with and
without target on it, see attached PDFs for
details. |
|
630
|
Tuesday, March 25, 2014, 09:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Ta#42 install and "new" 9 pin | Ta#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any |
|
629
|
Monday, March 24, 2014, 12:01 |
Travis Cave | ITW | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the west target
station to the south hot cell. |
|