528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has been moved from the
south hot cell to the west target station. |
|
527
|
Friday, October 25, 2013, 06:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Maico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because |
|
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
524
|
Thursday, October 24, 2013, 11:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the conditioning station to the south hot
cell. |
|
523
|
Thursday, October 24, 2013, 11:31 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#7 | Spent target move | UC #7 has been moved from the south hot
cell to the spent target vault, it was placed
in pail #110 and put in slot 8B of the vault, |
|
522
|
Wednesday, October 23, 2013, 12:07 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved back
to the south west silo from the south hot
cell. |
|
521
|
Wednesday, October 23, 2013, 09:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC #7 has been moved from the
south west silo to the south hot cell. |
|
520
|
Tuesday, October 22, 2013, 17:07 |
Bevan Moss | Conditioning Station | Standard Operation | | | services shut down | The turbo pump, roughing pump, have
been turned off and the valves for venting
opened. The cooling package has also been |
|
519
|
Tuesday, October 22, 2013, 17:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | HV testing | This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the |
|
518
|
Tuesday, October 22, 2013, 16:52 |
Bevan Moss | Conditioning Station | Repair | | | Canbus base card for BIAS | The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the |
|
517
|
Tuesday, October 22, 2013, 14:23 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | as measured today in the electrical room
by David and Anders |
|
516
|
Tuesday, October 22, 2013, 11:18 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC#7 has been moved from the
ITW to the south west silo. |
|
515
|
Monday, October 21, 2013, 12:29 |
Bevan Moss | Conditioning Station | Repair | TM4 | | BIAS Canbus | There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried |
|
514
|
Monday, October 21, 2013, 10:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Cooling On and Electrical Connections Made | The electrical connection have been
made and cooling package was started at ~10:50am
today |
|
513
|
Friday, October 18, 2013, 15:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pumps are on | The Turbo pumps are now running on
TCS |
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | With the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf. |
|
511
|
Friday, October 18, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Roughing Started | The roughing pump has been started. |
|
510
|
Friday, October 18, 2013, 14:33 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Module move | TM4 without a source tray was moved
from the SHC to the TCS. All went well. |
|
509
|
Friday, October 18, 2013, 13:43 |
chad fisher | South Hot-Cell | Repair | TM4 | | C2 Circuit Removal | The C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used |
|