  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
  480   Monday, September 30, 2013, 16:00 Bevan MossSouth Hot-CellStandard OperationTM3NiO#2Electrical check

    

       
            
  
  479   Monday, September 30, 2013, 15:59 Bevan MossSouth Hot-CellStandard OperationTM4SiC#29Module move from SW Silo to SHC TM4 was move by myself and Grant.
Move went smoothly, no hang ups.
  
  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been move from south
hot cell to the conditioning station.
  
  477   Monday, September 30, 2013, 12:23 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical checkResults of the various electrical checks
done on TM#3 while at the hot cell since
the 27th of September. View PDF for the details.
 TM#3_elec_chk_NiO#2_SHC2.PDF 
  476   Friday, September 27, 2013, 12:53 Bevan MossConditioning StationStandard OperationTM3NiO#2HP TGHT and TBHT conditioning Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical
 26092013_TM3_NiO#2_HP_testing.JPG26092013_TM3_NiO2_HP_testing.txt 
  475   Friday, September 27, 2013, 10:54 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved to the south
hot cell from the conditioning station.
  
  474   Thursday, September 26, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning

    

       
            
 TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG 
  473   Thursday, September 26, 2013, 15:00 Bevan MossConditioning StationStandard OperationTM3NiO#2RGA not connecting Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan
  
  472   Thursday, September 26, 2013, 14:55 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has
 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt 
  471   Thursday, September 26, 2013, 14:47 Bevan MossConditioning StationMaintenanceTM3NiO#2Water pumps turned on The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station
  
  470   Thursday, September 26, 2013, 14:42 Bevan MossSouth Hot-CellRepairTM3NiO#2Activities September 24 - 25

    

       
            
  
  469   Thursday, September 26, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM3NiO#2Leak check / Pressure Test

    

       
            
  
  468   Thursday, September 26, 2013, 14:31 Bevan MossSouth Hot-CellRepairTM3NiO#2Activities September 24 - 25September 24
 After the manipulator repair
Maico installed the NiO#2 onto the target
 elec_check.pdf 
  467   Thursday, September 26, 2013, 09:46 maicodallavalleConditioning StationRepairTM3 Leak check / Pressure TestTM3 has had all of the water lines pressurized
with Helium and the Helium Leak detector
was connected to the turbo pumps. There were
  
  466   Wednesday, September 25, 2013, 13:48 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkElectrical check of TM#3 in the conditioning
station under vacuum see attached PDF for
details.
 TM#3_elec_chk_NiO#2_CS.PDF 
  465   Wednesday, September 25, 2013, 11:08 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical checkThe module was checked electrically this
morning before the module move. See the attached
PDF for details.
 TM#3_elec_chk_NiO#2_SHC.PDF 
  464   Wednesday, September 25, 2013, 10:00 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved from the
south hot cell to the conditioning station.
  
  463   Wednesday, September 25, 2013, 06:59 maicodallavalleSouth Hot-CellStandard OperationTM3 Containment box coverThe containment box cover has had all 
the bolts installed and all bolts were checked
with a mirror. TM3 has been raised and is
  
  462   Tuesday, September 24, 2013, 14:46 Bevan MossSouth Hot-CellRepair  Right manipulator repair    