ID Date Author Category Type Module Target/Number Subject Text Attachments
  2575   Wednesday, May 01, 2024, 09:50 David WangITWStandard OperationTM4 TM4 has been connected to ITW.TM4 has been connected to ITW. see attachment.  Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf 
  2574   Tuesday, April 30, 2024, 09:20 David WangITWDevelopmentTM4 A new SST gas line is using for ITW febiad gas staion in pit.A new SST gas line with swagelock tube
fittings and VCR fit is using for ITW febiad
gas staion in pit. Gas line is leak checked
  
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check David Wang made E/L checking before
module moving to ITW. read attachment pls.
 TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf 
  2572   Monday, April 29, 2024, 14:21 David WangITE/ITWStandard OperationTM4 TM4 has been moved from SHC to ITW.TM4 has been moved from SHC to ITW. Peter
did the move. Travis helped on him.  
The move is successful. 
  
  2571   Saturday, April 27, 2024, 09:35 Carla Babcock; Alexander ShkuratoffConditioning StationDevelopmentTM3 TM3 source and service tray testingSaturday, April 27, 2024, 09:35 :
Started ramping up HV, EE and EL
together. First small spark at 20.5kV on
  
  2570   Friday, April 26, 2024, 13:22 David WangSouth Hot-CellStandard OperationTM4 TM4 has been moved from SMP to SHC.TM4 has been moved from SMP to SHC. Adam
and I did the move. the move is smooth. 
  
  2569   Friday, April 26, 2024, 08:59 David WangConditioning StationDevelopmentTM3 TM3 helium pressure test and electrical check with new source tray at TCS.TM3 helium pressure test and electrical
check with new source tray at TCS were done
yesterday. The results are excellent. See
 Scanned_from_a_Xerox_Multifunction_Printer_(9).pdf 
  2568   Friday, April 26, 2024, 08:56 David WangConditioning StationDevelopmentTM3 TM3 module top helium spray leak test. TM3 module top helium spray leak test was
done yesterday.  No leak on TM3 module
top @ LD base leak rate 0.0 x E-9 atm.cc/sec.
  
  2567   Wednesday, April 24, 2024, 10:15 David WangConditioning StationStandard OperationTM3 TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS.
The move is smooth. 
  
  2566   Tuesday, April 23, 2024, 17:34 Carla BabcockSouth Hot-CellRepairTM3 TM3 wire pullingWires were pulled in TM3 and service cap
was closed up again:
Einzel lens wire (30kV kapton), routed
  
  2565   Friday, April 19, 2024, 10:44 David WangSouth Hot-CellDevelopmentTM3 TM3 water lines helium spray leak check at SHC.TM3 water lines helium spray leak check
at SHC is done. No leak has been found on
all lines. seeattachment
 Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf 
  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today. ITH:MP1S pump inside lubricant was changed
today. old lubricant is dirty with dark color.
they are stored in sealed waste oil jug and
  
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out. Monday and Tuesday, I started TCS water
system and enabled the TCS chillers auto
stage in/out. I saw chiller 2 in/out three
  
  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday. TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when
  
  2561   Thursday, April 11, 2024, 06:07 David WangSouth Hot-CellStandard OperationTM3 Tm3 was moved from silo to SHC yesterday.Tm3 was moved from silo to SHC yesterday.
the move is smooth. 
  
  2560   Monday, April 08, 2024, 09:29 David WangCoolingStandard Operation  HALCW system general inspection. water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
The move is smooth. 
  
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  