  2568   Friday, April 26, 2024, 08:56 David WangConditioning StationDevelopmentTM3 TM3 module top helium spray leak test. TM3 module top helium spray leak test was
done yesterday.  No leak on TM3 module
top @ LD base leak rate 0.0 x E-9 atm.cc/sec.
  
  2567   Wednesday, April 24, 2024, 10:15 David WangConditioning StationStandard OperationTM3 TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS.
The move is smooth. 
  
  2566   Tuesday, April 23, 2024, 17:34 Carla BabcockSouth Hot-CellRepairTM3 TM3 wire pullingWires were pulled in TM3 and service cap
was closed up again:
Einzel lens wire (30kV kapton), routed
  
  2565   Friday, April 19, 2024, 10:44 David WangSouth Hot-CellDevelopmentTM3 TM3 water lines helium spray leak check at SHC.TM3 water lines helium spray leak check
at SHC is done. No leak has been found on
all lines. seeattachment
 Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf 
  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today. ITH:MP1S pump inside lubricant was changed
today. old lubricant is dirty with dark color.
they are stored in sealed waste oil jug and
  
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out. Monday and Tuesday, I started TCS water
system and enabled the TCS chillers auto
stage in/out. I saw chiller 2 in/out three
  
  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday. TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when
  
  2561   Thursday, April 11, 2024, 06:07 David WangSouth Hot-CellStandard OperationTM3 Tm3 was moved from silo to SHC yesterday.Tm3 was moved from silo to SHC yesterday.
the move is smooth. 
  
  2560   Monday, April 08, 2024, 09:29 David WangCoolingStandard Operation  HALCW system general inspection. water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
The move is smooth. 
  
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  
  2555   Wednesday, March 27, 2024, 09:49 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved to SHC from silo.Tm3 has been moved to SHC from silo. the
move is smooth. 
  
  2554   Monday, March 25, 2024, 10:55 David WangITEStandard Operation  ITE entrance module has been reconnected in ITE pit. ITE entrance module has been reconnected
in ITE pit per document 190510. 
  
  2553   Monday, March 25, 2024, 10:53 David WangITERepair  ITE entrance module has been moved from TCS to ITE.ITE entrance module has been moved from
TCS to ITE. The move is smooth. 
  
  2552   Thursday, March 21, 2024, 11:35 Ferran Boix PamiesITEDevelopment  Wiring of new thermocouple PLC module Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring
  
  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE SiloTM3 was moved from SHC to NE silo. Cable
tray was recently installed. 
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2549   Wednesday, March 13, 2024, 11:12 Keith C NgAssembly/Bench TestRepairTM3 optics tray for tm3Alignment notes attached for the optics
tray for the refurbished tm3 with the new
service and source tray.
 20240313_optics_tray_alignment_notes.pdf 