ID Date Author Category Type Module Target/Number Subject Text Attachments
  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection TM4 with spent target UCx#43 was
disconnected in ITE and is ready moved to
SHC. see attachment pls.
 TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf 
  2527   Monday, January 22, 2024, 10:16 David WangITEStandard OperationTM4UCx#Tm4 waterlines helium pressure test and TM service cap helium leak check.Tm4 waterlines helium pressure test and
TM service cap helium leak check was done
last Friday. All water lines were pressurized
  
  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.Entrance module has been connected in ITW
pit per document 190510 " entrance module
disconnection and removal procedure".
  
  2525   Monday, January 22, 2024, 09:50 David WangITWStandard Operation  ITW entrance module has been moved from SHC to ITW.ITW entrance module has been moved from
SHC to ITW. A slightly bump on module shielding
block bottom side corner to tank vessel side
  
  2524   Wednesday, January 17, 2024, 20:09 Carla BabcockSouth Hot-CellStandard Operation Ta#66Ta#66 post irradiation inspectionOn Jan. 9 we did the PIE on Ta#66. Opened
the heat shield and removed the EE. The inside
of the heat shield was very black with lots
 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg 
  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHCTa#66 post operation electrical check was
done at SHC this Monday. See attachment.
 TM2_Ta66_post__oeration_electrical_check.pdf 
  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC. ITW entrance module has been moved from
ITW to SHC. The move is smooth.  I cleaned
entrance module tank flange and o r-ing slot. 
  
  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.ITW entrance module has been disconnected
per document190510. It will be moved to SHC
for diagnostic group tomorrow. 
  
  2520   Thursday, January 11, 2024, 13:54 David WangConditioning StationDevelopmentTM3 TM3 servic cap air to vacumm seals leak check.After Tm3 service tray and service cap
installation, TM3 service cap air to vacuum
seals leak check has been done at TCS. TCS:IG1
  
  2519   Wednesday, January 10, 2024, 16:51 Carla BabcockITEStandard OperationTM4UCx#43UCx#43 failure To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in
  
  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot
 Target_Index_2023-01-10.pdf 
  2517   Tuesday, January 09, 2024, 16:10 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - SHC to SiloTM2 was moved with no target attached from
the South Hot Cell to a silo. 
  
  2516   Monday, January 08, 2024, 14:47 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - ITW to SHCTM2 was moved from ITW to the South Hot
Cell with Ta#66 target. 
  
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test. ITW primary and secondary vacuum vessel
leak check and TM2 water lines helium pressure
test are done today. No major concern. see
 ITW_2024_shut_down_leak_check.pdf 
  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.TM2 has been disconnected in ITW. All water
lines are nitrogen purged. Filled 60 psi
argon to all Tm2 water lines for module storage
 TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf 
  2513   Tuesday, January 02, 2024, 16:01 Carla BabcockConditioning StationDevelopmentTM3 TM3 service tray HV testing and conditioningTuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service
tray about 3pm today. Had to bypass TCS:BIAS
 Screenshot_from_2024-01-02_16-05-43.pngScreenshot_from_2024-02-08_17-57-50.png 
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  2511   Friday, December 15, 2023, 11:31 Adam NewsomeSpent Target VaultStandard Operation Ta#58Pail repack, transfer to mini-storage vaultPail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell.
 Target_Index_2023-12-15.pdf 
  2510   Friday, December 15, 2023, 11:07 Adam NewsomeConditioning StationStandard OperationTM3 TM3 Move - SHC to TCSTM3 was moved from the SHC to the TCS (no
target installed). 
  
  2509   Wednesday, December 13, 2023, 11:42 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - TCS TO SHCTM3 has been moved from the target conditioning
station to the south hot cell. 
  