  261   Wednesday, March 13, 2013, 15:26 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Roughing Started Roughing pumps were turned on at
15:23 13/03/2013.
  
  260   Wednesday, March 13, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Module Move TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a
  
  259   Wednesday, March 13, 2013, 14:30 Bevan MossConditioning StationDevelopment  Faraday Cup Dave Morris and I investigated the
Faraday Cup today. It was found to be plumed
in the wrong direction (fails in). This is
  
  258   Wednesday, March 13, 2013, 11:23 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakThe containment box has been re-installed
and the window waterlines reconnected and
leak checked.
  
  257   Wednesday, March 13, 2013, 07:22 chad fisherSouth Hot-CellRepairTM4 Ground Electrode Leak / Inspection ResultsFurther attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied
 IMG_3449.JPGIMG_3450.JPGIMG_3451.JPGIMG_3452.JPGIMG_3454.JPG 
  256   Tuesday, March 12, 2013, 09:18 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakOn Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak
  
  255   Friday, March 08, 2013, 15:50 Bevan MossITEStandard OperationTM4CS Test Target #1Module Move from ITE to SHC Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic
  
  254   Wednesday, March 06, 2013, 14:12 David WangITWRepair  ITW EXIT1 tank to module o-ring replacement ITW
EXIT1  o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring
  
  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  
  251   Friday, March 01, 2013, 11:35 David WangITEMaintenanceTM4 Leak check on ITE and TM4. The
leak  check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum  vessel 
  
  250   Tuesday, February 26, 2013, 13:53 David WangConditioning StationRepairTM4 Replaced TM4 TP1Bevan and I replaced TM4 TP1 today at conditioning
station .The pump will be started this week
when I do ITE and TM4 leak check .
  
  249   Tuesday, February 26, 2013, 13:24 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well.
  
  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module moveTM1 moved from the west station to the
southwest silo. Move went well.
  
  247   Friday, February 22, 2013, 13:13 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Broken Turbo Pump Today while putting the cover on
the cord that goes to the controller was
bumped. This bent the connector down and
 IMG_0528.JPG 
  246   Friday, February 22, 2013, 13:02 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1HV test with Water Hello Ray and Yi
Completed a HV test with the water
flowing today.
 vacuum_for_40k.JPG 
  245   Thursday, February 21, 2013, 14:05 David WangITWRepairTM1 Disconnected EXIT1 in ITW.Disconnected EXIT1 in ITW. All cables ,
wires and air lines are label marked.
  
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been
  
  243   Friday, February 08, 2013, 11:42 Grant MinorITEMaintenance  TAPC 477 resolved - ISAC elec. room gas cylinderSee attached TAPC 477 documentation.  TAPC-477_resolved_8Feb2013.pdf 
  242   Wednesday, February 06, 2013, 14:34 Bevan MossConditioning StationDevelopmentTM4CS Test Target #140kV All Common w/o Water Test Today the module was biased to 40kV
in the conditioning station. The current
draw was 0uA. Sparking started at 27 kV.
 40kV_no_water_HV_test.JPG 